P12C Bases Fixing Angle Tower Crane
- ZCJJ
- China
- 5days
- 20 sets
Mauritania Tower Crane, Western Sahara Tower Crane
Products Specification
Type , Model: P12C Bases Fixing Angle Tower Crane
Size: 1.2M
Use for : S24A1 S24D1 S24D2 mast section , 1.2m L type mast
Materials: Q345B
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
P12C Bases Fixing Angle Tower Crane
Tower Crane Knowledge sharing:
Tower crane fault judgment, fault classification: mechanical fault, electrical fault
Many aspects should be paid attention to when using the tower crane. Maybe a small problem will cause unnecessary accidents. In the process of using the tower crane, there are many reasons for failure, such as poor working environment, untimely maintenance, illegal operation of operators, natural wear and tear of parts and components, etc.
P12C Bases Fixing Angle Tower Crane
The common faults of tower cranes are generally divided into mechanical and electrical faults. Failure of mechanical system due to wear, deformation, fracture, stuck plug, poor lubrication and incorrect relative position of mechanical parts is collectively referred to as mechanical failure.
The failure of the electrical system due to the failure of the electrical circuit, components, electrical equipment and power supply system is collectively referred to as the electrical fault.
P12C Bases Fixing Angle Tower Crane
Mechanical failure is generally more obvious, intuitive, easy to judge. In tower crane operation, more common. Electrical faults are relatively common,some of which are intuitive and easy to judge, while others are hidden and difficult to judge.
However, if there is a big problem that cannot be solved by itself, it needs to be repaired by a professional tower crane maintenance company.
In addition, sometimes accidents happen when the tower crane is debugged. When the tower crane is abnormal, the installation and disassembly workers, tower crane driver and other operating personnel should immediately stop operation.
Timely report to the relevant departments, by the full-time maintenance personnel to repair, a throughout the treatment to eliminate hidden dangers, return to normal work