Topless 10Ton Tower Crane Flat Top
- ZCJJ
- China
- Stock
- 5 units
convenient to dismantle and install the tower crane under the limited condition of the construction site.
If limited by the field conditions,
the flat tower is undoubtedly the best solution when the truck crane cannot approach. Because of the unique boom connection mode of the flat-head tower, the whole boom can be disassembled and assembled in the air section by section, and the boom can be directly removed from the transport vehicle when necessary.
Description Specification
Topless 10Ton Tower Crane , Flat Top 10Ton Tower Crane
Model:TCT6016 ,10Ton
Jib length: 60m
Max load: 10Ton
Tip load: 1.6Ton
Mast type:
2m , L68A1 Mast Section , AND 1.6m , L46A1 Mast Section
Type, Stationary , Inter Climbing , Travelling.
Topless 10Ton Tower Crane , Flat Top 10Ton Tower Crane
Tower Crane Knowledge sharing:
Daily maintenance of metal structure parts of engineering crane
Daily maintenance of metal structure parts of engineering crane spray painting once every six months to one year. The rust spot, grease and other dirt on the metal surface should be removed before painting.
Topless 10Ton Tower Crane
1. Strictly implement the scrap standard of steel structure parts of cranes.
2. Check the metal fatigue strength, weld crack, structural deformation, damage and other conditions of the structure parts under the main stress; check the key welding seam of the structure parts under the main stress and the base material in the welding heat affected area if any abnormality is found, it shall be dealt with. The inspection of structural parts shall be carried out according to the following procedures.
Flat Top 10Ton Tower Crane
(A) daily inspection of the tower crane: the tower crane shall conduct A daily inspection every 80 hours. The tower crane driver should check the fastening of bolts at all connection parts when changing shifts. If there is any looseness, the bolts should be fastened in time.
(B) in case of any abnormal sound, wrong operation or malfunction of the tower crane safety protection device, the tower crane shall be inspected and recorded.
Flat Top 10Ton Tower Crane
(C) after the completion of a project, the demolition steps of the tower crane shall be described. After the demolition of the tower crane, it shall be inspected in detail and recorded by engineering technicians and professional maintenance personnel.
3. In the process of transportation, we should try our best to prevent structural parts from deformation and collision damage.
4. Spray paint every six months to one year. The rust spot, grease and other dirt on the metal surface should be removed before painting.