Anchor Frame Collar For S69R Mast
- ZCJJ
- China
- 5 to 30days
- 50 to 200 pcs, sets
San Marino Tower Crane, Malta Tower Crane,
Products Specification
Type , Model: Anchor Frame Collar For S69R Mast
Size: 2m for 2M L type mast
Materials: Q345B
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
Anchor Frame Collar For S69R Mast
Anchor Frame Collar For S69R Mast
Tower Crane Knowledge sharing:
make a good tower crane safety check list
Tower crane involves high-altitude work and heavy lifting, so the role of safety inspection for tower crane safety production should not be underestimated. The safety situation into a table, for the convenience of tower crane succession, establish an orderly safety inspection process, is also an essential link.
Although there are many types of tower cranes, the technical characteristics of tower crane drivers are different, and many of them come from tower crane leasing companies, we can still summarize the structure characteristics of tower cranes and develop a safety check list for tower cranes.
Anchor Frame Collar For S69R Mast
1. tower crane safety check list, including the project name, construction, supervision unit name, and the tower crane model, manufacturers are also essential. As for the inspection date and filing date, of course, can not be missing.
2. In the tower crane safety inspection form, the two premises of construction work environment and technical data shall also be recorded as memos, so as to leave valuable clues for future relevant investigations.
Anchor Frame Collar For S69R Mast
3. The safety inspection form of tower crane can be listed in detail according to different parts of tower body, safety device, mechanism and parts and electrical equipment, and relevant options can be set aside in accordance with the standard of qualified tower crane for filling in during inspection.
At the same time, the overall evaluation column should be set aside for inspectors to make a decision on the overall situation of the tower cranes, especially on the vital aspect of whether they can continue to be used, so as to ensure safety.
4. The tower crane safety inspection form shall be signed by the project manager, the project chief supervision engineer, the project leader of the construction unit, the inspection leader and other inspectors after the completion of the inspection, so as to assign the responsibility to the individual.
Anchor Frame Collar For S69R Mast