Type , Model: Anchor Frame Collar For 24A1 Mast

Size: 1.2m for 1.2M L type mast

Materials: Q345B

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

Anchor Frame SR24D1

Collar SR24D1 Mast

MC

Anchor Frame Collar For SR24D1 Mast

Tower Crane Knowledge sharing:

Risk factors and control methods of tower group operation

3.1 construction safety risk control

Environmental climate is highly unpredictable, so we mainly adapt to it rather than change it. In view of the environmental climate during the construction, adaptive measures are adopted for the work of the tower crane.

Anchor Frame Collar For SR24D1 Mast

3.1.1 when the weather is very bad, such as fog, heavy rain, snow and ice of grade 7 or above, the tower group work should be stopped and carried out on another day.

3.1.2 during the construction, if the working height of the tower crane must reach more than 50 meters, anemometer must be installed on the tower crane for wind detection. As soon as the wind force reaches above 2om/s, the tower group shall stop working immediately.

3.1.3 when the tower crane is not working, it shall be placed in the wind vane state, and the lifting boom shall face downwind.

3.1.4 for the tower crane, it is forbidden to hang heavy objects on the hook and rotate the lifting boom against the wind when it is not working. In any case, we should take safety measures according to the actual climate and environment.

3.2 control of security management risks

Safety management is a key factor to ensure the safety of tower group.

Anchor Frame Collar For SR24D1 Mast

3.2.1 tower crane mechanical staff must strictly do safety protection, wear safety helmet, fasten safety belt when working at high altitude, construction tools should be carefully checked before use to prevent mistakes.

3.2.2 before the work, the driver shall conduct trench communication and safety explanation for each safety officer and other ground construction personnel.

3.2.3 establish a complete and sound safety system, and the safety management personnel shall carry out daily inspection, so as to detect potential safety hazards in advance.

3.2.4 site staff shall strictly abide by the rules and regulations, and shall not use the tower crane where it is not suitable. In the company, should also take some safety measures, such as the establishment of a sound safety system, the construction personnel for technical training, safety guidance, and its technology for strict assessment

Construction personnel and technical personnel should also be strictly checked, according to the conventional procedures and national standards to select. In addition, good tower crane machinery repair and maintenance is also an important aspect of reducing the risk factor. For the tower components of the system are in accordance with the maintenance requirements for regular cleaning and maintenance.

The structural system must be carefully inspected and the performance of the tower crane must be in good condition. Before each use of the tower crane should be checked to check whether its power supply cable can work properly, check whether its accessories are complete, before the work must ensure that the normal operation of machinery.

Anchor Frame Collar For SR24D1 Mast

3.3 human-caused risk control

The prevention of hidden risks caused by human factors is mainly from the driver to strengthen. The professional skills of drivers as well as their behavioral ability and psychological endurance are all aspects we need to consider.

3.3.1 during the operation, when turning the tower crane in the cross operation, the driver should first observe the dynamics of the surrounding objects, and then inform the drivers of other tower cranes of the situation of the machine, so as to avoid accidents caused by collisions when they enter the operation area.

Once the construction is completed, the operator shall inform other tower pilots and proceed to the construction area in accordance with the sequence requirements.

Anchor Frame Collar For SR24D1 Mast

 

 