Type , Model: Anchor Frame Collar For S24D1 Mast

Size: 1.2m for 1.2M L type mast

Materials: Q345B

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

Anchor Frame S24D1

Collar S24D1 Mast

MC

Anchor Frame Collar For S24D1 Mast

Tower Crane Knowledge sharing:

tower crane disassembly, matters needing attention in the process of tower crane disassembly

Tower crane disassembly technology

1) order of tower crane disassembly

The disassembly order of the tower crane is the reverse of the installation order of the tower crane, which is: standard section balance weight steel wire rope lifting boom balance weight balance arm tower cap rotation casing frame standard foundation section.

Anchor Frame Collar For S24D1 Mast

2) matters needing attention in the demolition process of tower crane

A. Before the demolition of tower cranes, all the demolition personnel shall be organized to make a safety technical disclosure and carry out each work.

B. The tower crane disassembly workers have clear division of responsibilities and should stick to their posts. They must concentrate on their work and observe the dynamic drop of the upper part of the tower crane.

Anchor Frame Collar For S24D1 Mast

C. workers working at height must wear safety belts, non-slip shoes and hard hats.

D. check that the working of the hydraulic system must be stable and normal without jamming or oil leakage.

E. If the tower body is not lowered to the specified height, the attached wall device shall not be removed first.

F. When lifting the heavy arm and balancing arm of the tower crane, tie the connection with brown rope first and tie the stable rope straightenly, and then remove the shaft pin to prevent the hoisting from instability.

G. When the tower crane disassembles various pin shafts, strict measures should be taken to prevent pin shafts, pull rods and other high-altitude falling injuries.