Anchor Frame Collar For L69B2 Mast
- ZCJJ
- China
- 5 to 30days
- 50 to 200 pcs, sets
Slovenia Tower Crane, Croatia Tower Crane, Bosnia and Herzegovina Tower Crane
Products Specification
Type , Model: Anchor Frame Collar For L69B2 Mast
Size: 2m for 2M L type mast
Materials: Q345B
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
Anchor Frame Collar For L69B2 Mast
Tower Crane Knowledge sharing:
Tower crane safety inspection focus, tower crane safety inspection should pay attention to the problem
3. Safe distance between tower crane and transmission line and multi-tower operation
(1) there are many construction sites where tower cranes negotiate with overhead transmission lines in urban construction. As tower cranes and steel wire ropes enter into the dangerous area of overhead transmission lines, they collide with transmission lines, resulting in short circuit of transmission lines and breakage of steel wire ropes.
Anchor Frame Collar For L69B2 Mast
Many accidents have occurred in other areas. The safety distance between any part of the crane and the power line should meet the requirement of certain safety distance. If it is found in the inspection that the tower crane or the steel wire rope may enter the dangerous area of the transmission line.
Protective requirements shall be put forward, and the construction party shall be required to erect protective barriers and establish safety protective measures and systems.
When the tower crane is in normal operation, the protective barrier shall ensure that the lifting objects and steel wire rope of the tower crane cannot enter the dangerous area of the transmission line. When the wind force is more than 20m/s.
Anchor Frame Collar For L69B2 Mast
It shall stop working and put the hook at the root end of the lifting boom to avoid the hook and wire rope from entering the dangerous area of the transmission line when the wind rotates.
(1) for multi-tower operation, the construction unit shall be reminded to prepare multi-tower operation plan during detection, and the operation shall be approved by the technical director and chief supervision engineer of the construction unit
The safety distance between the big arm of the low tower and the standard section of the high tower shall not be insufficient. Have this kind of circumstance to happen, detect an unit to should report superior administration to be in charge of a branch to handle immediately.
Anchor Frame Collar For L69B2 Mast