Anchor Frame Collar 256HC Mast Liebherr

  • Anchor Frame Collar 256HC Mast Liebherr
  • Anchor Frame Collar 256HC Mast Liebherr
  • Anchor Frame Collar 256HC Mast Liebherr
Anchor Frame Collar 256HC Mast Liebherr
  • ZCJJ
  • China
  • 5 to 30days
  • 50 to 200 sets

Tunisia Tower Crane, Algeria Tower Crane,

Products Specification

Type , Model: Anchor Frame Collar 256HC Mast Liebherr

Size: 256HC ,2.3mx2.3mx4.14m masts

Brand: Liebherr tower crane

Materials: Q345B

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

Anchor Frame 256HC

Collar 256HC Mast

Liebherr 1.8m

Anchor Frame Collar 256HC Mast Liebherr

 

 

Tower Crane Knowledge sharing:

 

Tower crane hook hook, tower crane hook does not sway, hook does not sway from side to side

How to hook the tower crane

How to open the tower crane hook not sway

How to open the tower crane so that the hook does not sway from side to side

The above problem is a lot of new tower crane easy to meet problems, the new tower crane how to do a good hook hook action? The following is my tower crane manufacturers some reference answer, for you to open the tower crane friends reference.

Anchor Frame Collar 256HC Mast Liebherr

1. The most important thing in the basic operation of tower crane is the starting and stopping of the tower crane big arm. The acceleration and deceleration should be even.

 

Anchor Frame Collar 256HC Mast Liebherr

 

2. In the operation of tower crane, it is mainly to speed up and decelerate step by step. Do not overstep the gear. 2 to 3 seconds between each shift; Second, we should learn to follow the car, just like we used the wire pendant, use inertia, you will understand. When condole hook is thrown before, toward before with.

The length distance that follows namely should master, the friend that depreciation needs to open tower crane understands car run speed, of course, time grew, practice can make perfect.

3. If the lifting object swings back and forth in the air when the tower crane is opened, you can try to push the trolley operating rod to the back and then immediately empty it, and then push it to the front and then empty it, so that the cycle is also very effective.

Anchor Frame Collar 256HC Mast Liebherr

4. If the tower crane is opened, will the big arm still swing in that direction when the rotation arm stops suddenly? Encounter this kind of circumstance, you can block after coming out empty, answer big arm to opposite direction again a block, come out again empty, gimmick wants fast, practice can make perfect.

 

Anchor Frame Collar 256HC Mast Liebherr

 

 

 

 

 

 

 

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right