Anchor Frame Collar 1.6m For L46A1 Mast

  • Anchor Frame Collar 1.6m For L46A1 Mast
  • Anchor Frame Collar 1.6m For L46A1 Mast
  • Anchor Frame Collar 1.6m For L46A1 Mast
Anchor Frame Collar 1.6m For L46A1 Mast
  • ZCJJ
  • China
  • 5 to 30days
  • 50 to 200 pcs, sets

Georgia Tower Crane, Armenia Tower Crane

Products Specification

Type , Model: Anchor Frame Collar For 24A1 Mast

Size: 1.6m for 1.6M L type mast

Materials: Q345B

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

Anchor Frame Collar 1.6m L46A1

Collar 1.6m L46A1 Mast

FO 23

Anchor Frame Collar 1.6m For L46A1 Mast

 

Tower Crane Knowledge sharing:

 

Report on inspection and repair of limit device of tower crane

Since the beginning of construction this year, all project departments are in the construction, tower crane use is very tense. At present, the company has nearly 40 tower cranes, the limit of the inspection of the existence of deficiencies. Because the tower crane belongs to the large-scale machinery, and the limit device is the control part of the tower crane, which is an important part of the tower crane.

Anchor Frame Collar 1.6m For L46A1 Mast

In order to carry out the inspection and maintenance of the tower crane position limiter as soon as possible, the company only has a few people who know about inspection and maintenance. The engineering department has contacted the tower crane manufacturers and professional personnel of the installation company. There are three steps

Anchor Frame Collar 1.6m For L46A1 Mast

Because only two of the company's tower cranes are under warranty at present, and the limiters of other tower cranes are under repair, the manufacturer proposes to charge 200 yuan for each crane.

Anchor Frame Collar 1.6m For L46A1 Mast

2. On the other hand, I also contacted with the installation company and agreed to form a 4-person maintenance team from the company's mechanical repair and installation company to inspect and repair the position limiter of the company's tower crane, including the inspection and reinforcement of bolts attached to walls and standard sections. Try to finish it in a week.

3. The personnel of the tower crane manufacturer shall be considered as standby. If the inspection and maintenance take a long time, only the personnel of the manufacturer shall be put into maintenance to ensure the completion as soon as possible.

Anchor Frame Collar 1.6m For L46A1 Mast

 

 

 

 

 


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right