Anchor Frame Collar 1.2m For S24A1 Mast
- ZCJJ
- China
- 5 to 30days
- 50 to 200 pcs, sets
Brunei Tower Crane, Singapore Tower Crane, Indonesia Tower Crane, East Timor
Products Specification
Type , Model: Anchor Frame Collar 1.2m For S24A1 Mast
Size: 1.2m for 1.2M L type mast
Materials: Q345B
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
Anchor Frame Collar 1.2m For S24A1 Mast
Tower Crane Knowledge sharing:
Risk factors and control methods of tower group operation
3.3.2 before the operation, the driver must send out signals and operate in strict accordance with the requirements of the command personnel. In case the instructions of the command personnel are not clear enough, they must not try to figure out what to do, but should be clear and clear before proceeding. Signal director is also a key factor in human risk factor control.
In the process of command, the command personnel should pay close attention to the dynamics of the tower crane, especially between the hook and the object. When the tower crane rotates the boom, the commanding personnel should look around the situation, pay attention to the working situation of the surrounding tower crane, and carry out safety instructions according to the actual situation.
Anchor Frame Collar 1.2m For S24A1 Mast
Instruction language and gestures must be easy to understand, simple and capable, in addition, the command personnel should also comply with the "ten not hanging" provisions, the weight of the object to be hung clear, the object to be hung to be bound firmly, to ensure its safety and stability.
The combination of the signal commander and the tower unit is best fixed. If there is no special reason, do not change the signal commander at will.
The commander should not change at will or leave his post without coordination and communication with the tower crane owner. In the construction process, the signal commander and the tower crane should cooperate as well as possible. The owner of the aircraft must respond to the command after the signal is sent, and the command cannot send the signal until the master responds.
Anchor Frame Collar 1.2m For S24A1 Mast
3.4 risk control of construction projects
3.4.1 ensure the timely cleaning of the construction site, reduce the presence of obstacles in the construction environment to ensure the adequacy of the tower crane construction space.
3.4.2 guarantee the smoothness of the car in and out of the road, and ensure that it will not collide with objects within the radius of the tower crane's turning.
3.4.3 power distribution box, cable and other tools for tower crane must be complete, complete, safe and reliable.
3.4.4 ensure the safety, effectiveness and reliability of circuit facilities and electric lines during construction.
3.4. the construction site shall be equipped with lighting equipment capable of night construction, so as to ensure sufficient brightness to ensure the safe operation of the project even at night.
3.4.6 before the work of the tower crane, the engineering safety shall be fully disclosed.
Anchor Frame Collar 1.2m For S24A1 Mast