P16E Bases Fixing Angle Tower Crane

  • P16E Bases Fixing Angle Tower Crane
  • P16E Bases Fixing Angle Tower Crane
  • P16E Bases Fixing Angle Tower Crane
P16E Bases Fixing Angle Tower Crane
  • ZCJJ
  • China
  • 5days
  • 20sets

the Comoros Tower Crane , Mauritius Tower Crane,

Products Specification

Type , Model: Adaptor Mast From 1.6m L40 To 1.6 K40

Size: 1.6M

Use for : L44A1, L46A1,L46A2 ,L46A3 mast section ,P16A P16E, R16A, R16E , 1.6m L type mast

Materials: Q345B

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

P16E Bases

P16E Fixing Angle

L44A1 Fixing Angle

P16E Bases Fixing Angle Tower Crane

Tower Crane Knowledge sharing:

Mechanical equipment technology file management system

In order to strengthen the mechanical management, fully understand the use and maintenance of single equipment, especially the establishment of mechanical equipment technology file management system.

1. All equipment of the company must be allocated by the equipment department and purchased tower cranes according to the engineering needs.

2. All equipment files (including those under maintenance) shall be established by the equipment department of the company.

3. The equipment file shall be taken to the project management department together with the equipment, and shall be kept by the mechanical and electrical foreman of the project management department, and shall be handed over to the equipment at the same time when leaving the site.

 

 

P16E Bases Fixing Angle Tower Crane

 

4. The establishment of equipment archives for each fixed asset equipment includes

(1) fixed assets card.

(2) equipment number.

(3) certificate of conformity, instruction manual, attached list, vulnerable parts, etc.

(4) repair and maintenance record card.

(5) equipment scrap application form

6. Equipment acceptance, installation and debugging record. Large equipment must be filled in operation records and shift records.

5. The mechanical and electrical foreman of the project must keep the equipment files well, and shall not lose, lose or damage the year-end bonus of the mechanical and electrical foreman, circulate a notice of criticism, or be dismissed if it is serious.

6. The mechanical and electrical personnel of the project must fill in the maintenance and repair records carefully and fill in the spare parts replacement form, which shall be signed by the field material staff. If the equipment is confirmed to be scrapped, the scrapping application form shall be filled in and signed and confirmed by the equipment department of the company.

 

 

P16E Bases Fixing Angle Tower Crane

 

7. Minor repairs and daily maintenance records shall be filled in once a month.

8, where the overhaul equipment must be strictly planned, and the summary of the reasons for the replacement and handling advice, attached spare parts replacement table, after confirming the normal maintenance, the maintenance person in charge must carry out commissioning acceptance and sign confirmation.

9. For accident maintenance, the repair record card must be marked with the accident and maintenance opinions, and other maintenance procedures are the same as article 8.

10, fill in the equipment technical files must be correct handwriting, clear, do not fill or fill out a penalty of 20 yuan.

Attached to the system: fixed assets card; Equipment repair and maintenance records Spare parts replacement table; Equipment scrap application form.

 

 

P16E Bases Fixing Angle Tower Crane

 

 

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right