Fixing Angles S69J Basic Mast
- ZCJJ
- China
- 5days
- 20sets
Peru Tower Crane, Bolivia Tower Crane
Brazil Tower Crane
invention of the crane
tower crane rental rates
crane hire
Products Specification
Type , Model: Fixing Angles S69J Basic Mast
Size: 2M
Use for : L69 , L69B2 , L69B 2m L type mast, 2mx2mx3m
Materials: Q345B
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
Fixing Angles S69J Basic Mast
Tower Crane Knowledge sharing:
Ensure the safety of workers and equipment
Tower crane construction machinery factory in order to strengthen the construction site of the tower crane management, eliminate the tower crane in the construction of the existence of hazards, to protect the safety of workers and equipment safety
7. After the completion of tower crane installation, the project department shall organize the responsible personnel of the installation unit to conduct acceptance inspection together. After acceptance, submit to technical supervision department and labor department for acceptance. Use after acceptance.
8. The tower crane shall be well maintained in use. Retesting shall be carried out when idle more than a year after re-use,After improvement and overhaul,continue to use after re-installation,suffering from natural disasters .
9. After the tower crane is used for a long time under normal working conditions, it shall be overhauled, and the overhaul interval shall not exceed 15000h at the longest
The overhaul of tower cranes shall be carried out by professional units, and the project department shall not operate without authorization.
Fixing Angles S69J Basic Mast
10. The project department shall organize the regular safety inspection of the tower crane every half a month, the environmental safety system inspection every month and the vertical observation every month, and do a good job in equipment identification.
11. Before the removal of the tower crane, the system inspection shall be carried out first, the isolation zone and warning board shall be set up, and special personnel shall be assigned to monitor it to ensure that it meets the requirements.
12. The environmental safety officer of the project department is responsible for supervising the installation, maintenance, dismantling, inspection and inspection of the tower crane.
Fixing Angles S69J Basic Mast
13. The tower crane driver and conductor must be qualified and capable.
14. Tower crane installation personnel, person in charge of electromechanical management, maintenance electrician, mechanic, tower crane driver and commander shall pay attention to the system maintenance of tower crane. No person shall operate without authorization except the person in charge.
15. Each staff must master its environmental/risk factors, observe the safety technical operation rules, strictly implement the "ten no lifting" regulations of tower crane, and eliminate illegal command and illegal operation.
Fixing Angles S69J Basic Mast
16. Execution standard: tower cranes shall comply with safety regulations for tower cranes, safety regulations for hoisting machinery, safety technical regulations for use of construction machinery , company documents and other relevant standards and management regulations.