Fixing Angle 1.6m For L48A1 L48A3 Mast
- ZCJJ
- China
- 5days
- 20sets
the United States Tower Crane, Mexico Tower Crane,
Products Specification
Type , Model: Fixing Angle 1.6m For L48A1 L48A3 Mast
Size: 1.6M
Use for : L48A1, L48A3 mast section , P20A P20E, R20A, R20E
R16E , 1.6m L type mast
Materials: Q345B
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
Fixing Angle 1.6m For L48A1 L48A3 Mast
Tower Crane Knowledge sharing:
Tower crane maintenance, how to grasp the replacement of accessories time
Tower crane belongs to open-air and high-altitude working machinery, which has a huge use space in the fields of transportation, logistics, energy and construction.
Considering that tower crane accessories are often exposed to the test of the sun and rain, it is a key issue of safe production to do a good job in the replacement of tower crane accessories.
The tower crane fittings are numerous, each fitting work function, the work intensity is different, therefore the maintenance work should also from easy to difficult, carries on according to the system.
Tower crane maintenance is divided into: daily maintenance, primary maintenance, minor repair, medium repair, overhaul.
Daily maintenance:
Fixing Angle 1.6m For L48A1 L48A3 Mast
The work content of tower crane maintenance is different because of its type construction, which requires strict daily maintenance. Daily maintenance is carried out in each shift, and the driver is responsible for the operation.
The specific time can be carried out in the interval of the work shift, or in the process of the shift. During maintenance, the power supply must be cut off to stop the machine. Once found parts seriously wear, should be promptly shut down, shutdown, replacement.
Minor repairs
Every three months (800 ~ 1000 hours), by the driver, maintenance workers, technical personnel to complete. Its projects are
(1) carry out all the work of primary maintenance
(2) check or replace the transmission bearing
(3) replace the reducer oil
(4) inspect or replace the wire rope
(5) check all safety devices and carry out no-load drop test
(6) disassemble and inspect electrical components, and replace components with severe wear, burn and aging.
Fixing Angle 1.6m For L48A1 L48A3 Mast
Repair
The project shall be completed once a year (working for 3000 hours) or once a year, jointly completed by the tower crane driver, maintenance workers and technicians. Its contents include
(1) all work contents of minor repairs
(2) replace the wire rope
(3) replace brake block
(4) replace worn bearings
(5) inspection, alignment and welding of metal structure
(6) re-check, adjust and test all safety devices.
Fixing Angle 1.6m For L48A1 L48A3 Mast
Overhaul
The overhaul is generally a cumulative work of 1200 ~ 1800 hours, the content of which is to replace the parts and equipment of the tower crane on a large scale. This project should be carried out by professional repair workers in the machine shop or the production factory of the tower crane.