Fixing Angle 1.2m For S24D2 Mast
- ZCJJ
- China
- 5days
- 20sets
Botswana Tower Crane, Namibia Tower Crane,
Products Specification
Type , Model: Fixing Angle 1.2m For S24D2 Mast
Size: 1.2M
Use for : S24A1 S24D1 S24D2 mast section , 1.2m L type mast
Materials: Q345B
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
Fixing Angle 1.2m For S24D2 Mast
Tower Crane Knowledge sharing:
After the New Year, tower crane operation should pay attention to matters
The New Year new beginning, the tower crane factory wishes you in the New Year, the good luck
At present, people are gradually back to work, construction site after the winter break began to resume. After the New Year, the tower crane will be put into use again after being out of service for a period of time. Here, we summarize some of the things to pay attention to when the tower crane is put into use after the New Year.
Fixing Angle 1.2m For S24D2 Mast
1. There is no water accumulation or frost heaving deformation in the structure
After the winter, more or less snow, and the structure of the tower crane is not completely sealed, so some standard sections, components, gaps and other places will have some water.
In the inspection must pay attention to these parts, once found to clean up immediately, because the water will not only corrode the metal itself, but also cause greater damage in the heat expansion and cold contraction, as the season changes, the temperature increases, the corrosion will be multiplied.
2. Lubricating oil
After a longer period of time to place, before the start of the inspection must be on the reducer in the lubricating oil for careful inspection, to observe whether there is water and dust and other debris.
Not only to check the quality of oil and how much oil, but also to confirm the oil label, the need for seasonal replacement must be timely replacement, in order to avoid the normal use of imaging equipment.
Fixing Angle 1.2m For S24D2 Mast
3. wire rope
The steel wire rope plays an irreplaceable role in the tower crane, the standard of steel wire rope scrapping must be strictly implemented, and the steel wire rope which meets the scrapping condition must be scrapped and replaced immediately.
Due to a period of downtime, it is necessary to pay attention to the wire rope has no corrosion, surface impurities and so on. In the inspection also pay attention to the wire rope associated parts, such as the drum, line, pulley, rope card anti-groove device.
Also pay attention to the wire rope lubrication, only good lubrication can ensure the life of the wire rope and safe use.
Fixing Angle 1.2m For S24D2 Mast
4. Electrical system
Before the re-use of the wire rope must ensure its power independence, and ensure that "a machine, a brake, a leakage", can not be used for the unsatisfactory.
In the inspection of the electrical system should focus on the inspection of the distribution box whether there is water, dust, debris, cable damage and insulation, the motor itself and the junction box sealing, protection circuit, main parts, to ensure sensitive and reliable, safe and effective.