Fixing Angle 1.2m For S24A1 S24D1 Mast

  • Fixing Angle 1.2m For S24A1 S24D1 Mast
  • Fixing Angle 1.2m For S24A1 S24D1 Mast
  • Fixing Angle 1.2m For S24A1 S24D1 Mast
Fixing Angle 1.2m For S24A1 S24D1 Mast
  • ZCJJ
  • China
  • 5days
  • 20sets

Malawi Tower Crane, Mozambique Tower Crane

Products Specification

Type , Model: Fixing Angle 1.2m For S24A1 S24D1 Mast

Size: 1.2M

Use for : S24A1  S24D1  S24D2 mast section , 1.2m L type mast

Materials: Q345B

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

Fixing Angle 1.2m S24A1

Fixing Angle 1.2m S24D1

Fixing Angle 1.2m S24D2

Fixing Angle 1.2m For S24A1 S24D1 Mast

Tower Crane Knowledge sharing:

Safety technology for tower crane operation

1. The tower crane driver and signal personnel must pass the physical examination, have no diseases or physiological defects that hinder the operation, pass the training, and work with valid certificates. Lifting workers must wear safety protective equipment.

2. Before the operation, the driver must be familiar with the safety technical regulations for the use of construction machinery, be familiar with the mechanical performance of the tower crane.

its specification and relevant regulations and regulations of the state and industry, abide by the five good, ten no hanging and other relevant technical regulations, and do a good job in "cross operation cleaning, lubrication, adjustment, ruggedness, anticorrosion.

 

Fixing Angle 1.2m For S24A1 S24D1 Mast

3. The driver can't start operation until he gets clear signal from the command personnel. Ring the bell to signal before the operation.

4. Each shift of the tower crane shall have two drivers, one for operation and the other for ground monitoring to prevent accidents. Operators should focus on correct operation and pay attention to the working condition of the machine in the process of operation.

They are not allowed to leave their posts or hand over the machine to other unlicensed personnel for operation. Drivers are not allowed to work with excessive fatigue due to illness. Irrelevant personnel are strictly prohibited to enter the operation area or operation room.

5. There should be enough working area for tower crane operation. There should be no obstacles for lifting boom and turning radius.

 

Fixing Angle 1.2m For S24A1 S24D1 Mast

6. For tower cranes with multiple shifts, the shift shifting system shall be implemented and the shift shifting record shall be filled in carefully; The successor may not start the work until he has been checked and confirmed to be correct.

Every day, the driver and the commanding staff should carefully complete the tower crane operation shift record table after work, and check the weight limiter, torque limiter and all kinds of travel limit switch and other protective devices of the tower crane, to ensure that they are complete, sensitive and reliable.

The hidden dangers shall be rectified and eliminated immediately. It is strictly prohibited to use it while suffering from illness, to take risks, and to stop the machine by using the limit device instead of the control mechanism. The tower crane which operates one shift should be recorded daily.

 

Fixing Angle 1.2m For S24A1 S24D1 Mast

6. During the shift, the driver shall not leave his/her post without permission. It is necessary to leave the operation room.

In case of sudden interruption of power supply during work, when there is a heavy object hanging on the hook, the brake should be used repeatedly to loosen and tighten it slightly so that the heavy object can be lowered to a safe area slowly. Before working again, check whether the lifting action and direction are normal.

 

Fixing Angle 1.2m For S24A1 S24D1 Mast

 

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right