Bases Fixing Angles For SR24D1 Mast
- ZCJJ
- China
- 5days
- 20sets
Ghana Tower Crane, Togo Tower Crane,
Products Specification
Type , Model: Bases Fixing Angles For SR24D1 Mast
Size: 1.2M
Use for : S24A1 S24D1 S24D2 mast section , 1.2m L type mast
Materials: Q345B
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
Bases Fixing Angles For SR24D1 Mast
Tower Crane Knowledge sharing:
Cause analysis and elimination method of tower crane start button not start
Analysis of the reason why the tower crane start button is not started:
1. No working power supply for tower crane
2. Four-in-one protector action or damage
3. The operating handle is not at zero
4. The total startup control circuit is broken
5. The zero interlock contact or the start and stop buttons are damaged
6. The total contactor is burnt out.
Exclusion method
Bases Fixing Angles For SR24D1 Mast
1. Switch on the power supply of tower crane
2. Check the working voltage adjustment to 380V 5%, repair or replace the four-in-one protector, and adjust the phase sequence of the power supply
3. Reset the operating handle to zero
4. Check and repair
5. Inspect, repair or replace components
6. Replace the main starting contactor.
deal with the sudden power failure when the tower crane works
Bases Fixing Angles For SR24D1 Mast
When the tower crane is working, how to deal with the power failure? How to carry out rescue work quickly and effectively and minimize the risk of mechanical injury?
In order to ensure that the tower crane operation after a long period of sudden power failure, special emergency treatment and rescue plan. Sudden blackout tower crane emergency treatment method?
A. organization,
The project department establishes the emergency rescue command team, which is responsible for command and coordination.
Second, the responsibility
1. Responsible for on-site command, knowing the lifting height and boom position of tower cranes, and organizing on-site rescue work.
2. Responsible for site protection, cordon setting up, order maintenance and evacuation.
3. Responsible for notifying the equipment a position to organize rescue, calling rescue personnel and eliminating danger in time.
Emergency rescue procedures
When the tower crane in the normal operation of a sudden stop (long time) fault, so that the lifting object suspended in the air. For a long time, the following emergency measures should be taken
Bases Fixing Angles For SR24D1 Mast
1. All controllers shall be set to the 0 position to disconnect the total power supply.
2. by the professional maintenance personnel discontinuously with the hand to open the hoist brake or open the pull handle
Let the lifting object fall, each fall short distance, fall speed shall not exceed the rated speed, finally make the lifting object to the ground.
3. If there are obstacles and houses under the hanging objects. The following measures should be taken
(1) according to article 2, first lower the lifting object to a safe distance above the object or the house, and then take the measures of braking the co-rotating device or pulling the wave wind rope to prevent it from turning together under the action of wind.
Turn the tower crane boom back to the open place, or turn back to the safety part of the building, or temporarily put on the steel platform which can bear the tonnage of the lifting object and monitor, brake and turn together, set up the warning line, and then operate according to article 2.
(2) an alert area shall be set under the lifting object, under the supervision of a special person, and personnel shall not walk or work under the lifting object.
(3) if the office area is under the hanging object, the staff in the office under the hanging object must leave temporarily and take measures according to the method in article 2
(4) if the hanging object is a residential building below, the project department shall persuade and guide the residents in the building below the hanging object and take temporary evacuation measures
(5) after the power is restored and connected, a comprehensive inspection shall be carried out, and then the lifting object shall be transferred to the designated place for lowering.
4. Immediately organize safety self-examination and self-correction, eliminate hidden dangers, and ensure construction safety; The city is the organization of all construction workers by analogy safety re-education, improve safety awareness, to comply with rules and regulations, to prevent similar accidents.
5. In case of high fall accident in the rescue process, the emergency treatment and rescue plan of high fall accident shall be implemented immediately.
Bases Fixing Angles For SR24D1 Mast