Bases Fixing Angles For R86 Mast

  • Bases Fixing Angles For R86 Mast
  • Bases Fixing Angles For R86 Mast
  • Bases Fixing Angles For R86 Mast
Bases Fixing Angles For R86 Mast
  • ZCJJ
  • China
  • 5days
  • 20sets

Muscat Tower crane, NIZWA Tower crane, SALALA Tower crane
Doha Tower crane, Mussede Tower crane, Walker Tower crane,
Ouma Babu Tower crane, Omer Sala Muhammad Tower cran

Products Specification

Type , Model: Bases Fixing Angles For R86 Mast

Size: 2.9M 

Use for : R87 Mast R86 Mast  , 2.9x2.9x5.98m

Materials: Q345B

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

Bases R86 Mast

Fixing Angles R86 Mast

Bases Fixing Angles For R86 Mast

 

 

Tower Crane Knowledge sharing:

 

Special scheme for tower crane installation safety: installation requirements, preparation, jacking and operation

2. Operation of various institutions

When the air switch has been closed and the various agencies are ready to be operated, the left and right operating handles must be placed at the zero position first, and then the starting button is pressed to make the main contactor suction.

The power indicator is on, and the tower crane is in the working state to be ordered. Operation, can operate a single agency, but also can operate several agencies at the same time, depending on the need.

When not operating or stopping for a long time, press the stop button to quickly cut off the power supply.

 

Bases Fixing Angles For R86 Mast

 

3. Lifting mechanism

In the lifting mechanism, the brake is normally closed. When the power is on, the brake opens and when the power is off, the brake closes. During operation, handle should be operated step by step to implement lifting control.

After the running speed of the former gear tends to be stable, switch to the adjacent gear, so as to make the lifting as smooth as possible and reduce impact.

When running in the opposite direction, the operating handle must be moved back to the zero position step by step warning it is strictly prohibited to suddenly move in the opposite direction during running.

The continuous running time of gear I shall not exceed 2 minutes per minute]. After the mechanism slows down and stops, it runs in reverse. The relationship between speed and lifting weight of each gear is shown in the table:

 

Bases Fixing Angles For R86 Mast

 

4. Turning mechanism and safety limit mechanism

The rotary mechanism motor is a two-speed motor. In operation, if the handle is still sliding at a relatively fast speed when the handle is back to zero due to inertia or downwind influence, it can be stopped by reverse gear braking, but it is only limited to one gear .

Reverse gear braking in other gears is strictly prohibited. The rotating mechanism is equipped with disc brake, which is only used for fixing the arm of tower crane when working in windy state. Parking with brakes is strictly prohibited.

5. Luffing mechanism

The motor of the amplifying mechanism is a two-speed motor, with two gears for front and rear movement, a normally closed disc brake at one end of the reduction box , a power failure of the motor and a brake.

6. Jacking mechanism

The jacking mechanism brake switch is installed in the hydraulic jacking pump station.

7. to turn it off

When the tower crane is stopped from use after completion of construction, all operating handles shall be placed at zero, the general air switch shall be cut off, and the doors and Windows of the driver's cab shall be closed.

 

Bases Fixing Angles For R86 Mast

 

8. Operators must hold a post certificate.

Non-operators are not allowed to operate.

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right