Slewing Table For Tower Crane
- ZCJJ
- China
- store
- 10sets
Brasília Tower crane Spare parts, Sao Paulo Tower crane Spare parts,
Foz do Iguazul Tower crane Spare parts, Rio de Janeiro Tower crane Spare parts,
Manaus Tower crane Spare parts, Goiânia Tower crane Spare parts,
Products Specification
Slewing Table For Tower Crane
Tower Crane Slewing Table
Slewing mechanism
Slewing Table For Tower Crane
Tower Crane Slewing Table
slewing mechanism
Tower Crane Knowledge sharing:
Regulations on Safety Operation of Tower Hang: Basic, Disassembly, Operation, etc..
With regard to the foundation construction plan of Tower lifting, tower lifting and lifting, and the safe operation of Tower lifting, there are 25 regulations for the safe operation of Tower lifting.
(1) The rail or concrete foundation of the tower crane must be designed and checked before it can be used. Slope and drainage facilities should be built around the foundation and a certain safe distance should be maintained from the foundation pit.
(2) After the tower crane is installed, it shall undergo technical inspection and adjustment of the whole machine, and it shall be delivered for use only after the whole machine has passed the inspection in phases. In the absence of load, the vertical deviation between the tower body and the ground must not exceed 4/1000. The motor and hydraulic parts of the tower crane shall be carried out in accordance with the relevant provisions concerning electric motors and hydraulic devices.
(3) The metal structure of the tower crane, the track and the metal shell of all electrical equipment shall have a reliable grounding device, and the grounding resistance shall not exceed 4 Ω, and a lightning avoidance device shall be set up.
(4) The soil carrying capacity of the tower lifting base must be strictly in accordance with the original plant use regulations or meet: 8 to 12 T / M2 for medium-sized towers and 12 to 16 T / M2 for heavy towers.
Slewing Table For Tower Crane
Tower Crane Slewing Table
slewing mechanism
(5) The lifting and assembling of towers shall be carried out by a specialized team that has obtained the qualification certificate issued by the competent administrative department for construction, and shall be under the supervision of technical and safety personnel.
(6) The disassembly personnel shall wear safety and protective supplies, wear safety belts when working high, and be familiar with and conscientiously perform the disassembly process and operating procedures.
(7) Prior to operation, a comprehensive understanding of the environment around the work site, roads, overhead wires, buildings and weight and distribution of components is required.
(8) Before performing the actions such as tower crane swing, amplitude change, walking and hook lifting, the operator should sound. The voltage of the check power supply should reach 380V, and its change range should not exceed +20 V, -10 V. The start control switch before transmission should be in zero position. The power supply should be turned on and the metal structure part should be checked for no leakage.
(9) The commander of the tower crane must be certified for duty and should work closely with the operator during the operation. Operators must also be certified for duty, and should strictly execute the signals of the command staff during the operation. If the signal is unclear or wrong, the operator should refuse to perform it. If an accident is caused by an error in command, the commander shall be responsible.
Slewing Table For Tower Crane
Tower Crane Slewing Table
Slewing mechanism
(10) In the event of difficulties in the normal command of a tower hanging away from the ground in the control room, two commanding personnel at high altitude and on the ground may be set up, or effective contact methods such as walkie-talkies may be used to command.
(11) Safety protection devices, such as barometer, walking limiter, moment limiter, hook height limiter and various stroke limiter switches, must be complete, sensitive and reliable, and must not be arbitrarily adjusted and removed. It is strictly forbidden to replace the control mechanism with a limiting device.
Slewing Table For Tower Crane
Tower Crane Slewing Table
slewing mechanism