Pulley Block For Tower Crane

  • Pulley Block For Tower Crane
  • Pulley Block For Tower Crane
  • Pulley Block For Tower Crane
Pulley Block For Tower Crane
  • ZCJJ
  • China
  • store
  • 10sets

Addis Ababa Tower crane rental,, Aesetta Tower crane rental,,
Bachdal Tower crane rental,, Asosa Tower crane rental,,
Gambella Tower crane rental,, Hallele Tower crane rental,,

Products Specification

Pulley Block For Tower Crane

Tower Crane Pulley Block

Tower Crane Hook Block

From 3Ton to 25Ton

Tower Crane Pulley Block

Tower Crane Hook Block

SCM SYM YONGMAO

 

 

 

 

Pulley Block For Tower Crane

Tower Crane Pulley Block

Tower Crane Hook Block

 

Tower Crane Knowledge sharing

Several general emergency treatment methods after tower crane accident
Tower lifting is a large-scale machinery for high altitude operations. It consists of a large amount of steel and a large body. In addition, it is necessary to lift heavy weights. Therefore, preventing and correctly handling accidents is the most important part of Tower lifting construction.

1. ground accident
The foundation is the "foundation of the tower" of the tower crane. The soft and collapsed foundation is the culprit of the tower crane collapse accident.

Therefore, once it is found that the tower crane foundation is sinking and tilted: the operation should be stopped immediately and the rotary mechanism should be locked to limit its rotation. The anchor is then set up according to the situation to control the tilt of the tower crane.
2. tower hanging overturned
The method of welding and connecting is adopted to increase the balance moment and control the dangerous development without destroying the instability force.
In accordance with the emergency plan, the tower crane is removed and the deformed parts are cut or adjusted with gas welding.
3. tower boom
The tower crane is divided into two parts: the balance arm and the lifting arm. The former is the main part of the tower crane work, and the latter is the main mechanism for maintaining the balance of the tower crane.

If a folding arm phenomenon is found, any action of the tower crane should first be stopped. According to the emergency plan, according to the situation, the tower crane structure is reinforced by means of welding, or the tower crane structure is connected to other objects by connecting methods to prevent the tower crane from tipping and accidents during the demolition process.

Then use 2-3 moderate tonnage cranes, a lock up arm, a lock balance arm. One of them acts as a balancing moment when breaking the arm to prevent the sudden change of force from causing tipping.

 

Pulley Block For Tower Crane

Tower Crane Pulley Block

Tower Crane Hook Block

 

Following the order specified in the rescue plan, the deformed connecting parts in the lifting arm or balancing arm connector are removed, cut with air welding, and the arm rod is removed with a crane。

Finally, according to the normal procedures to dismantle the tower crane, in case of deformation of the structure with steam welding cut.
4. tower structure deformation, fracture, welding
1 The tower balance arm corresponds to the deformed part, and the turning arm process must be stable and locked.
According to the situation, the structure of the tower crane is deformed or broken, and the welding site is reinforced.
The tower replaced the damaged structure.
5. Anchorage system danger situation
1 The tower balance arm corresponds to the building, and the turning arm process must be stable and locked.
2 Reinforcement of the tower anchor system.
3 If you need to replace Anchorage system components, first reduce the tower machine to a specified height, and then replace the components.

 

Pulley Block For Tower Crane

Tower Crane Pulley Block

Tower Crane Hook Block

 

Composition of the hydraulic system, functional description of each component
Composition of the hydraulic system, functional description of each component
1. Energy components
It supplies the pressure of the hydraulic system and converts the mechanical energy output of the original idea into the pressure energy of the oil, thus advancing the work of all hydraulic systems. The most commonly used is the hydraulic pump, which supplies the hydraulic system with power.
2. Execute Widgets
The hydraulic energy is converted into mechanical energy installation, that is, hydraulic cylinders, to drive the movement of working parts. The most commonly used are hydraulic cylinders or hydraulic Motors.
3. Control components
Contains a variety of valves, such as pressure valves, flow valves and direction valves, used to control the hydraulic system's liquid pressure, flow(Tassel) and direction to ensure that the performance element achieves the expected work activities.
4. Auxiliary components
Refers to various pipe joints, tubing, fuel tanks, filters, pressure gauges, etc., which play a helping role in connecting, storing oil, filtering, and measuring oil pressure to ensure that the hydraulic system is solid, stable, and long-term.
5. Working medium
Refers to the oil that is subjected to pressure and transmits pressure in a hydraulic system, individually mineral oil, collectively referred to as hydraulic oil.

 

Pulley Block For Tower Crane

Tower Crane Pulley Block

Tower Crane Hook Block

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right