MCT200 Tower Crane Lease Rent Hire

  • MCT200 Tower Crane Lease Rent Hire
  • MCT200 Tower Crane Lease Rent Hire
  • MCT200 Tower Crane Lease Rent Hire
MCT200 Tower Crane Lease Rent Hire
  • Famous Global
  • Global
  • 5 to 50days
  • as u need units

Benin used Tower Crane, Niger used Tower Crane, Canary Islands West used Tower Crane

MCT200 Tower Crane Lease Rent Hire

Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,

Model,

Jib length,   m

Max load,   Ton

Tip load,    Ton

Type, Stationary , Inter climbing ,Travelling,

And other Famous brand, Model ,  Depend on the brand , Model Ability , Year , Height and etc u want.

We have large units store.  From 6Ton to 20Ton. Store and Service all over the world.

 

Mean time , We supply all the Spare Parts U may need as follow,

Masts Section ,  Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.

MCT200 Tower Crane

SPARE PARTS

MAST SECTION

 

MCT200 Tower Crane Lease Rent Hire

Tower Crane Knowledge sharing:

What requirements shall be met for the installation method of tower crane attachment device

The length of each strut of the structural member of the tower crane attachment device can be adjusted. Each strut should be kept in the same plane. The length of the top block and strut should be adjusted to make the axis of the tower body vertical. Generally, after the attachment, the theodolite shall be used to check and adjust the perpendicularity of the tower crane shaft line.

The perpendicularity of the tower body below the attachment point shall not be greater than 2/1,000, and the perpendicularity of the tower body above the attachment point shall not be greater than 3/10,000. The adjustment of the verticality can be realized by adjusting the advance and retreat of the bolt on the strut.

MCT200 Tower Crane Lease Rent Hire

The installation of the attachment device of the tower crane shall comply with the requirements of the instruction of the tower crane. The erection distance of the attachment device and the free height above the attached wall point shall not be arbitrarily excessively long (the specific attached wall point is allowed to be appropriately adjusted in the range of 1m according to the actual situation of the building). The extra long attachment brace should be designed separately and checked for strength and stability.

The first attachment distance of the tower crane is 24 m from the foundation surface. As the adding node of the tower crane increases, the corresponding number of attachment is increased. The maximum height of the tower crane cantilever shall not exceed 27 m.

 

MCT200 Tower Crane Lease Rent Hire

Tower crane attachment of installation, two and a half framework set in the standard section, rely on two framework between 16 M20 banding connecting bolts the standard section, and then through the poles to support the tower, the attached device through the pin shaft is connected with attached frame will be attached to one end of the poles, on the other end connected to the fixed on the building of embedded parts, to form a stable structure itself.

MCT200 Tower Crane Lease Rent Hire

The frame sleeve (also known as ring beam sleeve) is welded by Angle steel and steel plate. When in use, the frame sleeve is on the standard section. The standard section is secured by the top block with 8 adjusting bolts at the four corners. The frame is connected with the building by 3 or 4 struts.

The connection point between the struts and the building should be selected on the concrete column or concrete ring beam. The embedded part is combined with concrete, and the embedded part or the wall bolt is connected with the building structure.

 

MCT200 Tower Crane Lease Rent Hire

It is very dangerous to use expansion bolts instead of embedded parts, or use cable and wind rope instead of attachment support, because the attachment device and its accessories are the same products produced by the manufacturer as the standard section. The use of substitutes reduces the strength and stability of the attachment device

MCT200 Tower Crane Lease Rent Hire

 

TOWER CRANE USED

LIEBHERR TOWER CRANE USED

TEREX TOWER CRANE USED

SYM TOWER CRANE USED

SCM TOWER CRANE USED

YONGMAO TOWER CRANE USED

COMEDIL TOWER CRANE USED

 

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right