MC205B Tower Crane Lease Rent Hire
- Famous Global
- Global
- 5 to 50days
- as u need units
Guam used Tower Crane. New Caledonia used Tower Crane,
MC205B Tower Crane Lease Rent Hire
Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,
Model,
Jib length, m
Max load, Ton
Tip load, Ton
Type, Stationary , Inter climbing ,Travelling,
And other Famous brand, Model , Depend on the brand , Model Ability , Year , Height and etc u want.
We have large units store. From 6Ton to 20Ton. Store and Service all over the world.
Mean time , We supply all the Spare Parts U may need as follow,
Masts Section , Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.
MC205B Tower Crane Lease Rent Hire
Tower Crane Knowledge sharing:
Chapter three make a detailed work plan
In the first chapter, the personnel's responsibilities and basic requirements, and in the second chapter, the installation location, the bearing capacity of the foundation and the conditions of adhesion. In the third chapter, a thorough work plan is made.
In order to ensure the smooth and tight installation of each tower crane, it is very necessary to make a thorough work plan for tower crane installation. The current situation of tower crane installation is that most of the time the installation team will not make a thorough installation plan and work with their heads, which will lay hidden dangers for the safety of tower crane installation.
MC205B Tower Crane Lease Rent Hire
Work plan of tower crane installation, disassembly and climbing
The installation, disassembly and climbing of tower cranes shall be subject to detailed work plans and corresponding supervision. During the planning phase, the installation organization may use a checklist to ensure that no omissions are made.
The plan shall be made by the person who has practical operation experience, and the working meeting attended by all relevant personnel shall be held before the construction so that everyone can understand the operation procedure and their responsibilities. The work plan shall contain at least the following contents:
MC205B Tower Crane Lease Rent Hire
1. Transportation mode for tower crane entering
2. Selection and positioning of auxiliary cranes in the process of loading/unloading
3. Arrangement of access channels for transport vehicles
4. Site condition of tower crane installation
5. Maximum height and boom length to be installed for tower crane
6. Surrounding obstacles
MC205B Tower Crane Lease Rent Hire
7. All special lifting equipment required during installation
8. Liaison with the owners of adjacent facilities
9. Local government departments and institutions that need to be contacted as required by laws and regulations
10. Necessary road closure arrangements
11. Practical information obtained from the manufacturer's instruction manual in a language fully understood by the installer
MC205B Tower Crane Lease Rent Hire
TOWER CRANE USED
LIEBHERR TOWER CRANE USED
TEREX TOWER CRANE USED
SYM TOWER CRANE USED
SCM TOWER CRANE USED
YONGMAO TOWER CRANE USED
COMEDIL TOWER CRANE USED