scm tower crane
-
Topkit 10Ton Tower Crane Hammer Head
The boom section usually has 4m, 5m or 10m sections. Taking the 50m lifting boom as an example, its maximum unit mass is only about 1/5 of the total amount of lifting boom. Compared with the whole lifting, the lifting equipment required by the disassembling and assembling of the boom in air section by section is greatly reduced, which not only saves the cost of disassembling and assembling, but also is safer and faster.
Email Details -
Luffing Jib 8Ton Tower Crane
Luffing jib tower crane the large elevation Angle of the lifting arm is equivalent to the increase of the height of the tower body, and the effective extension of the working range is almost the semi-sphere space with the length of the lifting arm as the radius.
Email Details