L68B2 Mast Section Precautions for tower crane foundation pouring and technical requirements for tower crane foundation pouring

10-12-2019

1. The bearing capacity of tower crane foundation shall not be lower than the ground endurance value specified in the technical requirements of tower foundation drawing.

L68B2 Mast Section:

http://www.towercranesupply.com/product/l68b2-mast-section-for-tower-crane-mastsL68B2 Mast Section



2. The pouring position of the tower crane foundation shall be convenient for the installation and disassembly of the tower crane, avoiding all kinds of big obstacles.


3. The inclination of the horizontal plane formed by the four fixations of the tower crane foundation is not more than 1 / 1000.


4. Tower crane foundation shall be free of displacement and collapse. Drainage measures shall be taken around the foundation without ponding. The grounding pile shall be driven down as required.


5. The foundation pouring of tower crane shall avoid the backfilling section as far as possible. If not, effective measures shall be taken to make the bearing capacity of the foundation meet the requirements.


6. When the tower crane foundation is poured on the foundation, the bottom surface of the foundation shall be flat or slightly lower than the foundation pit. The soil quality and ground endurance of the foundation shall be known in advance. If there are hidden rivers, quicksand and sludge around the foundation, effective measures shall be taken to make the bearing capacity of the foundation meet the requirements.

L68B2 Mast Section:

http://www.towercranesupply.com/product/l68b2-mast-section-for-tower-crane-masts

L68B2 Mast Section

7. If the tower crane foundation is poured at the side of the foundation pit, the foundation pit retaining system or the underground continuous wall of the foundation pit, effective measures shall be taken to strengthen the surrounding of the foundation and prevent the uneven settlement of the foundation, so as to ensure that the foundation does not collapse, displace or tilt.


8. When the tower crane foundation is placed on the natural foundation far away from the foundation pit, the ground endurance of the foundation shall meet the specified requirements, and the foundation shall be compacted after proper excavation.

L68B2 Mast Section:

http://www.towercranesupply.com/product/l68b2-mast-section-for-tower-crane-masts

L68B2 Mast Section