L68B1 Mast SectionThis paper introduces the reasonable arrangement and height balance coordination of tower crane position

16-12-2019

1. The plane layout of the tower crane shall be based on the actual situation of the site, so that the whole construction surface can be covered by the scope of the tower crane as much as possible, without or without blind area, and there shall be sufficient safety distance between adjacent tower cranes.

L68B1 Mast Section:

http://www.towercranesupply.com/product/l68b1-mast-section-for-tower-crane-mastsL68B1 Mast Section



2. Avoid nearby buildings and structures (such as high-voltage wires, etc.) within the slewing range of tower crane


3. Ensure that there is a reliable anchoring position for the building within the scope specified in the tower crane instructions (the balcony and the central structure shall be kept away from changes and positions).


4. Multiple tower cranes operate at the same time, which may cross each other on the horizontal plane. In order to prevent the collision accident of the tower crane boom, the installation height of the tower crane shall be staggered in strict accordance with the provisions of the construction scheme. According to the construction safety standards, the fixed tower crane in the operation of multiple tower cranes: the distance between the end of the low tower arm and the high tower body shall not be less than 2m, and the vertical distance between the high tower hook and the low tower shall not be less than 2m.


5. When multiple tower cranes are working at the same time, the height difference between the tower cranes before and after anchoring and the time difference between anchoring shall be considered carefully to ensure that the height difference between the tower cranes is maintained during the whole construction process of the main structure. In case of special circumstances or conflicts with the plan, it shall be adjusted in time.

L68B1 Mast Section:

http://www.towercranesupply.com/product/l68b1-mast-section-for-tower-crane-masts

L68B1 Mast Section

6. Ensure that after the completion of the project, there is still sufficient space for disassembly and transportation of components out of the construction site.