L46A1 Mast Section tower crane accessories maintenance cycle
tower crane is open-air, high-altitude Operation Machinery, withstand the test of the sun and rain, so do a good job rest, replacement work is very important. Now, the maintenance cycle for crane fittings.
L46A1 Mast Section
http://www.towercranesupply.com/product/l46a1-mast-section-for-tower-crane-masts
The tower crane fittings are numerous, each fitting work function, the work role each has the difference, therefore the maintenance work should also from easy to difficult, carries on according to the system. The management should be systematized, the operation should be systematized and the command should be standardized. The Red Maintenance of construction lift is divided into: daily maintenance, first-class maintenance, minor repair, intermediate repair, major repair. The maintenance work of tower crane is different due to the different structure of its type workers (SS type, SC type, etc.) , which requires strict daily maintenance. Daily maintenance is carried out in each shift, by the operator, the specific time can be carried out in the interval of the work shift, can also be carried out in the course of shift change. The maintenance must be cut off the power supply, so that the machine stop running. Once found that there are parts seriously worn, should be timely shutdown, shutdown, replacement.