SR28ER Basic Mast Tower Crane Masts

  • SR28ER Basic Mast Tower Crane Masts
  • SR28ER Basic Mast Tower Crane Masts
  • SR28ER Basic Mast Tower Crane Masts
SR28ER Basic Mast Tower Crane Masts
  • ZCJJ
  • China
  • store
  • 10sets

Moscow Tower crane rental, Yakutsk City Tower crane rental,
St. Petersburg Tower crane rental, Vladivostok Tower crane rental,
Yekaterinburg Tower crane rental, Nizhny Novgorod Tower crane rental,

Products Specification

Type , Model: SR28ER Basic Mast Tower Crane Masts

1.2m Basic Masts

10.5m tower crane mast

Size: 1.2mx1.2mx10.5m

Materials: Q345B

Within: Pins, bolts, Ladder, Platform

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

SR28ER Basic Masts

SR28ER Base tower crane

10.5m tower crane mast

 

SR28ER Basic Mast Tower Crane Masts

 

Tower Crane Knowledge sharing:

 

The performance and quality of the lifting mechanism directly reflect the performance of the whole machine
Tower lifting is a necessary lifting equipment in the construction, transportation, and logistics industries, and the part of the tower lifting lifting weight is the tower lifting lifting mechanism, and its performance and quality directly reflect the performance of the tower lifting.

At the same time, it is also the most powerful mechanism in the three major structures of the tower crane. It mainly consists of motors, speed reducers, brakes, and racks.
First of all, let us understand the motor parts in the lifting mechanism -- the type of motor used in the tower crane and the lifting performance of the long arm crane for good or bad voting.

So far, the lifting Motors widely considered suitable for use are: multi-speed Motors, winding Motors, Variable frequency motor. Its performance and price are increased one by one, the same type of product is not the same manufacturer's production process, its quality and price difference is also very large.
The tight continuation is a speed reducer that can not be absent from the tower crane parts. Until now, the tower crane has considered it appropriate to use a multi-stage cylindrical gear speed reducer. However, because the market competition is very tight, the company's management philosophy is different. The production process that is considered suitable and used is not the same, and its quality and price are very different.

According to my understanding, in order to meet the low demand of the market, some speed reduction machine factories do not do heat disposal and external disposal at all.

As a result, the performance of the products is not guaranteed at all, and the survival period is greatly reduced. It quickly revealed a very noisy situation.

 

SR28ER Basic Mast Tower Crane Masts

 

 

In addition to this, the reliability of the tower crane brake in the lifting mechanism also directly affects the safety performance of the tower long-arm crane.


 


The selected factory value should be concerned. The metal structure of the frame is roughly similar to that of the tower long-arm crane. The main effect is to provide physical support for the lifting mechanism. Whether its structure and material selection are reasonable is also a problem for demand.

Strict implementation of scrap standards for the repair and maintenance of metal structures for tower cranes
Repair and maintenance of the metal structure parts of the tower crane: The main structural parts should be inspected for metal fatigue strength, weld cracks, structural deformation, damage, etc., and the key weld parts of the main structural parts and the parent materials in the welding heat affected areas should be inspected.

If an exception is found, it should be processed. Strictly implement the scrap standard of steel structure parts for tower lifting.
Repair and maintenance of the metal structure of the tower crane shall be carried out in accordance with the following procedures:

SR28ER Basic Mast Tower Crane Masts

 

Tower lifting demolition:
When a project is completed and the tower crane is dismantled, the engineering technicians and professional maintenance personnel should conduct detailed inspections and make good records.

In the course of transportation, every effort should be made to prevent structural deformation and collision damage. Brush paint every six months to one year. Rust, oil and other dirt on the metal surface should be removed before painting.
Tower crane installation:
Safety acceptance work of tower crane. Now, we must classify and summarize the relevant items before installing the tower crane.

 First, we must accurately and reasonably locate the floor plan and elevation map provided by the project department. We must not only be able to facilitate installation, but also be able to dismantle smoothly. The wall spacing should be reasonable.

The installation of multiple tower hoists should consider the minimum interference with another tower hoist within the radius of the tower hoist. According to the geological report provided by the project department, it is necessary to judge whether the ground endurance of the tower crane installation position meets the requirements of the manual。

 

SR28ER Basic Mast Tower Crane Masts

If it does not meet the requirements, it should work out a feasible plan together with the company's technical department to make pile reinforcement treatment or increase the foundation, and provide calculation basis。

Then provide the base map of the tower to the project department and construct it according to the plan. The base steel bar and concrete of tower crane should have quality insurance policy, concrete test block report, urgent check list. According to the basic diagram, the reinforcement shall not be arbitrarily deleted. And shall be valid by the signatory of the supervision department.

After the tower crane is installed, it must be well observed, measured, recorded, and archived in order to correct the problem in time and ensure that the vertical degree of the tower crane is within 3 inches.
Routine inspection:
The tower crane shall undergo a daily inspection every 80 hours of work. The tower crane driver should check the fastening condition of the bolts at each connection site when handing over the shift.

If there is any loosening, it should be fastened in time. When there is an abnormal sound in the tower crane, or there is a mistake in operation, or when the security protection device for the tower crane is found to have failed, it should be checked and recorded.
Power system:

SR28ER Basic Mast Tower Crane Masts

Should be equipped with a tower crane special distribution box, in line with one machine, one gate and one leak regulations. The insulation resistance of the main circuit and control loop should be greater than 0.5 MΩ, and there should be a reliable protection ground.

The resistance value should not be greater than 4 Ω, and a reliable lightning protection ground should be provided; The control loop shall be provided with an emergency stop start, Overflow, loss of pressure, fault phase, and wrong phase protector.

The tower crane distribution box shall be equipped with a rainproof device. The top of the tower, the end of the tower arm, and the tail of the balanced arm should be equipped with a collision signal; Warning devices such as horns or electric bells should be installed inside the driver's room.