S24D2 Mast Section For Tower Crane Masts

  • S24D2 Mast Section For Tower Crane Masts
  • S24D2 Mast Section For Tower Crane Masts
  • S24D2 Mast Section For Tower Crane Masts
S24D2 Mast Section For Tower Crane Masts
  • ZCJJ
  • China
  • 10days
  • 50pcs

Lima Tower crane, Cusco Tower crane,
Trujillo Tower crane, Machu Picchu Tower crane,
Arequipa Tower crane, Iquidos Tower crane,

Products Specification

Type , Model: S24D2 Mast Section For Tower Crane Masts

Size: 1.2mx1.2mx3m 

Materials: Q345B

Within: Pins,  Ladder, Platform

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

S24D2 Mast Section

S24D2 Masts

1.2m L type Masts

S24D2 Mast Section For Tower Crane Masts

 

 

Tower Crane Knowledge sharing:

Summary of preventive measures for collapse accidents - strengthening the management of tower crane installation and disassembly

According to the analysis of tower crane accidents reported in recent years, the accidents occurred in the process of tower crane installation and disassembly account for a large proportion of tower crane accidents.

Therefore, the management of tower crane installation and disassembly is also the key to ensure the safety of tower crane.

Based on the analysis of the causes of tower crane collapse accidents, it is concluded that tower crane collapse accidents are mainly caused by the problems of installation, disassembly, use and the quality of the tower crane itself.

Careful handling of disassembly declaration procedures:

Prior to the installation and disassembly of tower cranes, the user shall, in accordance with relevant regulations, report to the relevant government departments in charge, and provide the required declaration materials.

 

S24D2 Mast Section For Tower Crane Masts

 

The installation and disassembly shall be conducted only after the examination and approval of the government departments in charge.

Select a qualified installation and disassembly team:

The unit using the tower crane shall select a team with the corresponding professional qualification to undertake the installation and disassembly work, and shall not entrust the installation and disassembly work to a unit without the corresponding professional qualification.

Carefully prepare the installation and disassembly plan, and disclose the safety technology

Before the installation and disassembly of the tower crane, the disassembly and assembly unit must prepare a detailed and feasible disassembly and assembly construction plan.

The compilation basis, project overview, foundation construction, tower crane installation, safety measures and other contents shall be included in the plan, and the plan shall be examined, approved and signed in a complete manner.

 

S24D2 Mast Section For Tower Crane Masts

 

The plan shall be submitted to the entrusting unit for approval before implementation.

Before the installation and disassembly of the tower crane, the disassembling unit shall conscientiously disclose the safety technology of the tower crane to all the construction personnel, and shall go through the confirmation procedures for the safety technology disclosure.

Strictly follow the disassembly and assembly procedures. In the process of disassembly and assembly, the disassembly and assembly procedures must be strictly followed according to the specific requirements of different types and specifications of tower cranes to prevent accidents. Make the selection of disassembly equipment.

Before the tower crane is disassembled and installed, the lifting equipment shall be selected according to the situation of the construction site, the maximum weight of structural parts and the height of installation.

Take safety protection measures on the site of tower crane installation and disassembly

Warning signs shall be set up, safety signs shall be put up, and safety officers shall be responsible for the safety work on site. Timely handling acceptance procedures and permit.

Site acceptance:

 

S24D2 Mast Section For Tower Crane Masts

 

After the completion of the installation of tower cranes, the competent government departments must be timely invited to conduct on-site acceptance inspection and issue the permit for permitted use.

Record the disassembly file. The user shall sort out and record the technical data of the tower crane into the equipment management file according to the regulations.

Strengthen the use management of tower cranes

Use management is an important part of equipment management, is to ensure that the use of mechanical equipment is always in a good technical state, to ensure the safety of equipment operation key.

 

 

 