MDT368 L16 Tower Crane Lease Rent Hire
- Famous Global
- Global
- 5 to 50days
- as u need units
Kuwait used and the United Arab Emirates (UAE) used Tower Crane, Oman used Tower Crane,
MDT368 L16 Tower Crane Lease Rent Hire
Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,
Model,
Jib length, m
Max load, Ton
Tip load, Ton
Type, Stationary , Inter climbing ,Travelling,
And other Famous brand, Model , Depend on the brand , Model Ability , Year , Height and etc u want.
We have large units store. From 6Ton to 20Ton. Store and Service all over the world.
Mean time , We supply all the Spare Parts U may need as follow,
Masts Section , Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.
MDT368 L16 Tower Crane Lease Rent Hire
Tower Crane Knowledge sharing:
What inspection work should be done after the tower crane is installed
After the installation of the tower crane inspection work, tower crane installation to do a good job after the inspection work
First, the tower crane safety device inspection
MDT368 L16 Tower Crane Lease Rent Hire
1. Torque limiter
2.Lifting weight limiter
3. Lifting height limiter
4. Car amplitude limiter
5. Turn limit device
6. Hook release device
7. Anti-falling device for trolley
8. Rope breaking protection device
MDT368 L16 Tower Crane Lease Rent Hire
After the completion of installation as long as the acceptance of the tower crane as long as the air test, rated lifting load test and overload dynamic test, the new machine to carry out static load test and insulation test.
Check the electrical protection device of tower crane
1. The special distribution box for tower crane should be equipped to meet the requirements of one machine, one brake and one leakage. Main circuit and control circuit of the insulation resistance should be greater than 0.5 M Ω, should be reliable grounding protection, resistance value should be no greater than 4 Ω, should have reliable lightning protection grounding;
2. The control loop shall be equipped with emergency stop position startup, over-current, loss of voltage, phase break and phase fault protector. Distribution box of tower crane should be equipped with rainproof device.
3. Anti-collision signal lights shall be installed on the top, tower arm end and balance arm tail; Warning devices such as horn or bell should be installed in the cab.
Iii. Other examinations
1. Whether the split pin of each connection part is complete and bifurcated; Whether the connecting pin is matched with the manufacturer and whether the material meets the requirements
2. Whether the brake disc (including lifting, turning and trolley) has excessive wear, the clearance should be adjusted well
3. If the wire rope and rope clip meet the requirements of the code, they shall be scrapped if they reach the scrapping standard, and the size and distance direction of the rope clip shall meet the requirements of the code.
The above three items should be carefully checked before the overall hoisting of the tower crane to avoid rework during installation. The above items should be accurate, sensitive and reliable, strictly in accordance with the requirements of the manual operation.
4. A commander shall be equipped during the use of the tower crane, and the communication tool shall be a walkie-talkie
5.There should be a carbon dioxide dry powder fire extinguisher in the cab.
With the legalization of safe production, the use of special equipment and production, safe production management has become an important symbol of a company's management level and an important guarantee for the sustainable development of enterprises. Only to achieve the standard and reasonable use of the unit can be used at ease, gratified, comfortable with the machine, the company itself also feel at ease with the heart
MDT368 L16 Tower Crane Lease Rent Hire
LIEBHERR TOWER CRANE USED
TEREX TOWER CRANE USED
SYM TOWER CRANE USED
SCM TOWER CRANE USED
YONGMAO TOWER CRANE USED
COMEDIL TOWER CRANE USED