MDT249J12 Tower Crane Lease Rent Hire
- Famous Global
- Global
- 5 to 50days
- as u need units
Bangladesh used Tower Crane , India used Tower Crane
MDT249J12 Tower Crane Lease Rent Hire
Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,
Model,
Jib length, m
Max load, Ton
Tip load, Ton
Type, Stationary , Inter climbing ,Travelling,
And other Famous brand, Model , Depend on the brand , Model Ability , Year , Height and etc u want.
We have large units store. From 6Ton to 20Ton. Store and Service all over the world.
Mean time , We supply all the Spare Parts U may need as follow,
Masts Section , Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.
MDT249J12 Tower Crane Lease Rent Hire
Tower Crane Knowledge sharing:
Analysis of the structure of the hydraulic system of the tower crane
Tower crane, it with towering posture, force pull jun ground for construction, transportation carrying tons of goods. However, how does a tower crane lift,these heavy objects? This also has to start from the tower crane hydraulic system.
MDT249J12 Tower Crane Lease Rent Hire
As we all know, the tower crane is divided into the following major components -- metal components, such as lifting boom, tower body, turntable, bearing, balance arm, chassis, spire, etc. Parts and components, such as wire rope, trolley, pulley, slewing support, hook and brake, etc.
Working mechanism, such as lifting mechanism, luffing mechanism, trolley traction mechanism, slewing mechanism and cart travelling mechanism (travelling tower crane), etc.Safety devices, such as limit switch, overload protector, buffer stop device, wire rope anti-trip device, anemometer, emergency safety switch, safety protection signal machine, etc., in addition, is the hydraulic system of tower crane.
MDT249J12 Tower Crane Lease Rent Hire
The main components in the hydraulic system of tower crane are hydraulic pump, hydraulic cylinder, control element, oil pipe and pipe joint, oil tank and hydraulic oil filter, etc.
Among them, tower crane hydraulic pump and hydraulic motor is the most complex part of the hydraulic system, hydraulic pump oil inhalation and through the pipeline to the hydraulic cylinder or hydraulic motor, and hydraulic cylinder is the implementation of the hydraulic system components.
MDT249J12 Tower Crane Lease Rent Hire
Hydraulic pump can be seen as the hydraulic and heart, is the source of hydraulic energy. Most of the hydraulic pumps used in the Chinese tower crane hydraulic jacking system are cb-g type gear pumps. CB is not a gear code. Hegelong G is a fixed axial clearance
The whole process of a hydraulic jacking can be divided into 7 steps, which are
1. Move the balancing weight so that the tower body is not subject to the unbalanced moment, the lifting boom is in place, the direction is the same as the imported track orientation and locked, and a standard section of the tower body is hoisted and placed on the ferry trolley
2. Top
3. The positioning pin is in place and locked, and the piston rod is lifted to form the introduction space in the casing frame
4. Introduction of standard section
5. Lift the standard section and launch the ferry car
6. Put the standard section in place and install the connecting bolt
7. Jacking up slightly, pull out the positioning lock to make the transition joint and the connected high tower crane body be integrated.
MDT249J12 Tower Crane Lease Rent Hire
USED LIEBHERR TOWER CRANE
USED TEREX TOWER CRANE
USED SYM TOWER CRANE
USED SCM TOWER CRANE
USED YONGMAO TOWER CRANE
USED COMEDIL TOWER CRANE
LIEBHERR TOWER CRANE USED
TEREX TOWER CRANE USED
SYM TOWER CRANE USED
SCM TOWER CRANE USED
YONGMAO TOWER CRANE USED
COMEDIL TOWER CRANE USED