MCT88 Tower Crane Lease Rent Hire

  • MCT88 Tower Crane Lease Rent Hire
  • MCT88 Tower Crane Lease Rent Hire
  • MCT88 Tower Crane Lease Rent Hire
MCT88 Tower Crane Lease Rent Hire
  • Famous Global
  • Global
  • 5 to 50days
  • as u need units

Vanuatu used Tower Crane, Micronesia and the Marshall Islands used Tower Crane. Palau used Tower Crane,

 MCT88 Tower Crane Lease Rent Hire

Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,

Model,

Jib length,   m

Max load,   Ton

Tip load,    Ton

Type, Stationary , Inter climbing ,Travelling,

And other Famous brand, Model ,  Depend on the brand , Model Ability , Year , Height and etc u want.

We have large units store.  From 6Ton to 20Ton. Store and Service all over the world.

 

Mean time , We supply all the Spare Parts U may need as follow,

Masts Section ,  Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.

MCT88 Tower Crane

SPARE PARTS

MAST SECTION

 

MCT88 Tower Crane Lease Rent Hire

Tower Crane Knowledge sharing:

Chapter one: duty and basic requirement of personnel

How to install the tower crane safely and efficiently? The factory compiled how to ensure the safety of tower crane installation series of articles"to provide the majority of friends in the tower crane industry for reference.

A successful completion of a work is inseparable from the harmony of people, things and environment, among which, the human factor plays an important role, therefore, chapter one, we saythe responsibility and requirements of tower crane installation personnel.

 

MCT88 Tower Crane Lease Rent Hire

1) responsibilities of engineering manager

A) to review matters related to tower crane installation, including work plan, selection of tower crane installation location, work procedures and supervision. It should also include consultations with other supporting units (such as car cranes) and ensure collaboration with the relevant units where necessary.

B) arrange a comprehensive inspection and inspection of the tower crane, and confirm that the tower crane has been maintained as required.

C) ensure the effective operation of the procedures for fault and accident reporting, and adopt the necessary correct handling methods for fault and accident.

D) responsible for organizing the installation, disassembly and climbing of tower cranes.

E) verify that all installation components of the tower crane and the corresponding power matching are consistent with the instruction of the tower crane manufacturer.

 

MCT88 Tower Crane Lease Rent Hire

2) requirements for tower crane installation personnel

A) have the certificate of special operation for tower crane installation

B) aged over 18

C) adaptation to the job, in particular vision, hearing, flexibility and responsiveness

D) have the physical strength to carry heavy objects safely, including installing tower cranes

E) capable of climbing

 

MCT88 Tower Crane Lease Rent Hire

F) capable of estimating load mass, balancing load and judging distance, height and clearance

G) training in hoisting and signal technology

H) capable of selecting spars and accessories according to load conditions

I) receive comprehensive training in the installation and disassembly of tower cranes and the operation of the type of tower cranes installed

J) receive comprehensive training in the installation and debugging of safety devices of the installed type tower crane

K) be fully familiar with and master the requirements of relevant sections in the operation manual of the tower crane manufacturer

L) proficiency in and proper use of all personal safety equipment.

3) responsibilities of tower crane installation supervisor

The installation supervisor shall not leave the site during the whole installation/disassembly and climbing process of the tower crane. In addition to the duties of tower crane installer, the tower crane installation supervisor also has the following duties

A) manage all erection personnel and operators of relevant auxiliary hoisting equipment that may be used during installation disassembly.

B) provide technical measures to ensure the operation of the tower crane according to the installation work plan of the tower crane.

C) ensure that the ancillary facilities of the tower crane are completely consistent with the installation report.

D) verify that all installation personnel are equipped with necessary tools and personal security protection equipment.

E) ensure the correct installation of channel equipment along with the installation process, so as to facilitate the use of the installer. In particular

 ladder connecting bolt

 handrails, especially on the rest platform and inspection platform

 the passage from the ground to the bottom of the lowest ladder or the bottom of the tower crane

 access from the building to the tower crane.

In addition to meeting the requirements of the tower crane installer, the tower crane installation supervisor shall also meet the following conditions

 

MCT88 Tower Crane Lease Rent Hire

 

A) more than 5 years of experience in the installation and disassembly of tower cranes or similar equipment and training in installation supervisor

B) be familiar with and possess the user manual of the tower crane

C) received training in management of tower crane installation and disassembly personnel

D) can verify the applicability of the equipment used in the installation process.

 

 

TOWER CRANE USED

LIEBHERR TOWER CRANE USED

TEREX TOWER CRANE USED

SYM TOWER CRANE USED

SCM TOWER CRANE USED

YONGMAO TOWER CRANE USED

COMEDIL TOWER CRANE USED

 

 

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right