MCT385 L14 Tower Crane Lease Rent Hire
- Famous Global
- Global
- 5 to 50days
- as u need units
Serbia used Tower Crane, Macedonia used Tower Crane, Albania used Tower Crane,
MCT385 L14 Tower Crane Lease Rent Hire
Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,
Model,
Jib length, m
Max load, Ton
Tip load, Ton
Type, Stationary , Inter climbing ,Travelling,
And other Famous brand, Model , Depend on the brand , Model Ability , Year , Height and etc u want.
We have large units store. From 6Ton to 20Ton. Store and Service all over the world.
Mean time , We supply all the Spare Parts U may need as follow,
Masts Section , Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.
MCT385 L14 Tower Crane Lease Rent Hire
How to correctly choose the installation site of tower crane
Our company is specialized in tower crane design, production and sales of professional companies, with professional tower crane technology, tower crane knowledge. In this paper, how to choose a suitable installation site for tower crane
MCT385 L14 Tower Crane Lease Rent Hire
First, check whether the subgrade and track laying meet the requirements, bury the ground anchor, and determine the location of the ground anchor according to the rotation and lifting direction of the tower and the total height of the tower.
MCT385 L14 Tower Crane Lease Rent Hire
Secondly, the main anchor and auxiliary anchor. The main ground anchor is the key to tower uplift, all the load of rotating lifting tower is borne by the main ground anchor, and in the tower demolition, still need to use the ground anchor, so it must be carefully buried, to achieve the required bearing capacity, and make anti-corrosion treatment.
MCT385 L14 Tower Crane Lease Rent Hire
The center of the anchor wheel must be consistent with the center of the gauge, so as to ensure that the tower is always rotated along the center surface of the gauge in the lifting process, without eccentricity, so as to balance the force on the gate frame. The function of the auxiliary ground anchor is to loosen the wire rope with rotation when the tower is lifted. This ground anchor is the anchor point of the insurance wire rope to prevent the tower from collapsing in the opposite direction during rotation