MCT 370 L14 Tower Crane Lease Rent Hire

  • MCT 370 L14 Tower Crane Lease Rent Hire
  • MCT 370 L14 Tower Crane Lease Rent Hire
  • MCT 370 L14 Tower Crane Lease Rent Hire
MCT 370 L14 Tower Crane Lease Rent Hire
  • Famous Global
  • Global
  • 5 to 50days
  • as u need units

Zambia used Tower Crane, Angola used Tower Crane, Zimbabwe used Tower Crane,

MCT 370 L14 Tower Crane Lease Rent Hire

Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,

Model,

Jib length,   m

Max load,   Ton

Tip load,    Ton

Type, Stationary , Inter climbing ,Travelling,

And other Famous brand, Model ,  Depend on the brand , Model Ability , Year , Height and etc u want.

We have large units store.  From 6Ton to 20Ton. Store and Service all over the world.

 

Mean time , We supply all the Spare Parts U may need as follow,

Masts Section ,  Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.

MCT 370 L14 Tower Crane

SPARE PARTS

MAST SECTION

 

MCT 370 L14 Tower Crane Lease Rent Hire

Tower Crane Knowledge sharing:

The basic technical requirements of tower crane are summarized

Tower crane operators must master solid skills in order to avoid improper operation of tower crane accidents caused by. In this paper, the tower crane plant  on the basic technical requirements for the operation of the tower crane workers are briefly summarized, I hope to help the majority of the tower crane workers.

 

MCT 370 L14 Tower Crane Lease Rent Hire

 

1. Scaffolding workers (construction workers for erection of building height) shall be trained and assessed for special operations and safety technology of high work, and obtain the special operation operation certificate and physical examination before the erection and removal of scaffolding.

2. The frame workers must set up the tower cranes in strict accordance with the requirements of the special tower crane construction scheme and operating rules, and correctly wear and use labor protection articles during the setting up.

3, the scaffold shall not be mixed with steel and bamboo, the main force rod, such as the pole, big cross-bar, small cross-bar and scissors support, etc., in the same building facade must use the same material materials.

 

MCT 370 L14 Tower Crane Lease Rent Hire

 

4, set the tower crane pole should be equidistant, longitudinal spacing shall not be greater than 1.8 water, scaffolding from the wall should not be greater than 20 cm. Those larger than 20 cm must be isolated.

5, the main pole of the scaffold connection point must stagger; The connection point of the steel tube scissor support must be lap, and the lap length shall not be less than 50 cm.

6. The top of scaffold must be sealed according to the requirements of regulations; The inner pole shall be 50 cm lower than the cornice, and the outer pole shall be 1 m higher than the cornice. The outer side of the scaffold, starting from the second step, must be set

 

MCT 370 L14 Tower Crane Lease Rent Hire

1.2 meters high protective railings and 30 meters high foot bar; The top row of handrails shall have no less than two rails, with a height of 1.2m and 1.8m respectively.

7. The steel pipes and fasteners used for erection must comply with the national standards. It is prohibited to use steel pipes with serious corrosion, bending deformation or cracks, and fasteners with brittle, deformation and smooth wires are also prohibited.

8, set up scaffolding must be carried out in accordance with the norms, that is: horizontal and vertical, strong connection, feet really, layers of knot, support straight, smooth and flat, complete facilities, strong.

 

MCT 370 L14 Tower Crane Lease Rent Hire

 

9. The inner pole of the scaffold and the outer wall shall be protected as required. Scaffold ramp shall have independent support system, corner rest platform shall not be less than 2 square meters, ramp slope shall not be greater than l:3, the spacing of non-slip strip shall not be more than 30 cm.

10, steel pipe scaffold pole feet should be vertical stability on the concrete pad block or concrete hardened foundation, and set up longitudinal, transverse sweeping rod.

11, the scaffolding debris must be often cleaned, found feet and hands pieces damaged or bent, deformation, should be replaced in time.

 

MCT 370 L14 Tower Crane Lease Rent Hire

 

12. It is strictly prohibited to pull the cable and the wind rope on the scaffold and set the lifting handle pole; It is not allowed to put the material chute on the scaffold and set up the receiving platform; It is not allowed to use the method of oblique pull and slant lifting to feed from the scaffold.

13. The two ends of the foot rest frame, the corner and the scissors support on the outside must be connected in place, and the construction and quantity of the drawing points should meet the requirements.

14. The distance between the scaffold and all kinds of transmission lines must meet the required safety distance otherwise, necessary safety protection measures must be taken. When setting up and dismantling the frame, attention must be paid to safety, to prevent rod contact and injury after high-tension wire.

15. The safety protection, strength, rigidity and stability of the scaffold with the operating surface higher than 2 meters must also meet the relevant requirements.

16. The scaffold must have a good lightning protection grounding device, and the grounding resistance shall not be greater than lo ohm.

17, the removal of scaffolding and material hoist should be clearly responsible for the command of a person, before the demolition must be carried out a comprehensive inspection of the frame whether there are other things, the hoist and scaffolding, building connection, etc.

To designate special personnel to guard against demolition; Demolition must be set up in reverse order layer by layer from top to bottom, one step at a time. It is forbidden to demolish it simultaneously.

18. The removed steel pipe, foot and hand pieces, fasteners, dense mesh safety net and other objects shall be passed down or hung down with a rope, and shall not be tossed down.

19. Steel pipes, foot and hand pieces, fasteners, safety nets, etc. shall be sorted into categories, stacked neatly, and signs shall be hung.

20, scaffolding erection, must apply for acceptance.

 

TOWER CRANE USED

LIEBHERR TOWER CRANE USED

TEREX TOWER CRANE USED

SYM TOWER CRANE USED

SCM TOWER CRANE USED

YONGMAO TOWER CRANE USED

COMEDIL TOWER CRANE USED

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right