MCR295 H25 Tower Crane Lease Rent Hire
- Famous Global
- Global
- 5 to 50days
- as u need units
Tanzania used Tower Crane, Uganda used Tower Crane, Rwanda used Tower Crane,
MCR295 H25 Tower Crane Lease Rent Hire
Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,
Model,
Jib length, m
Max load, Ton
Tip load, Ton
Type, Stationary , Inter climbing ,Travelling,
And other Famous brand, Model , Depend on the brand , Model Ability , Year , Height and etc u want.
We have large units store. From 6Ton to 20Ton. Store and Service all over the world.
Mean time , We supply all the Spare Parts U may need as follow,
Masts Section , Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.
MCR295 H25 Tower Crane Lease Rent Hire
Tower Crane Knowledge sharing:
What are the inspection requirements and deformation reasons of tower crane steel structure
The deformation of tower crane steel structure includes local bending deformation, distortion and eccentricity. According to the requirements for deformation inspection of tower crane steel structure, the deformation shall be deemed as exceeding the following range:
MCR295 H25 Tower Crane Lease Rent Hire
1. The straightness tolerance of the bar along the full length longitudinal axis is 1/750.
2. The deformation of the main chord in use shall not be greater than 3‰ ~ 5‰.
3. The web bar deformation shall not be greater than 2 ~ 4mm.
4. The hole pitch error of rod connection bolts shall not exceed 1/2 of the assembly clearance, and the roundness error of screw holes shall not exceed l/2 of the assembly clearance.
MCR295 H25 Tower Crane Lease Rent Hire
Reasons for deformation of tower crane steel structure are as follows
(1) due to collision, knocking and other reasons, resulting in local bending deformation of steel structure;
(2) because the connection bolt is loose, so that the screw hole wear into ellipse, resulting in the eccentricity between each arm, rod produce additional bending moment;
(3) accidental collision deformation of steel structure caused by misoperation.
(4) long-term overload use, make the steel structure yield deformation
MCR295 H25 Tower Crane Lease Rent Hire
If the balance of the superstructure is not adjusted when jacking, and the center of gravity of the jacking part is not placed on the jacking oil cylinder, the top structure loses its balance and even the center of gravity is offset greatly. The pressure of the guide wheel of the climbing frame on the main chord of the standard section is too large, which makes the main chord of the tower body bend and deform, and the steel structure of the tower crane becomes unstable and causes accidents.
MCR295 H25 Tower Crane Lease Rent Hire
TOWER CRANE USED
LIEBHERR TOWER CRANE USED
TEREX TOWER CRANE USED
SYM TOWER CRANE USED
SCM TOWER CRANE USED
YONGMAO TOWER CRANE USED
COMEDIL TOWER CRANE USED