MCR295 H16 Tower Crane Lease Rent Hire

  • MCR295 H16 Tower Crane Lease Rent Hire
  • MCR295 H16 Tower Crane Lease Rent Hire
  • MCR295 H16 Tower Crane Lease Rent Hire
MCR295 H16 Tower Crane Lease Rent Hire
  • Famous Global
  • Global
  • 5 to 50days
  • as u need units

Madeira (Portugal) used Tower Crane
Ethiopia used Tower Crane, Eritrea used Tower Crane

MCR295 H16 Tower Crane Lease Rent Hire

Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,

Model,

Jib length,   m

Max load,   Ton

Tip load,    Ton

Type, Stationary , Inter climbing ,Travelling,

And other Famous brand, Model ,  Depend on the brand , Model Ability , Year , Height and etc u want.

We have large units store.  From 6Ton to 20Ton. Store and Service all over the world.

 

Mean time , We supply all the Spare Parts U may need as follow,

Masts Section ,  Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.

MCR295 H16 Tower Crane

SPARE PARTS

 

MAST SECTION

 

MCR295 H16 Tower Crane Lease Rent Hire

Tower Crane Knowledge sharing:

5010 tower crane foundation construction and specific operation technology

Tower crane foundation construction

1. according to the plane of tower crane of crane foundation design orientation figure, tower crane foundation drawing (1 # crane foundation for punching single pile with cap, the size is 5000 * 5000 * 1500 mm, base peak elevation of 107.6 m), by the surveyor spilled earthwork excavation slope line, the excavation to the tower crane foundation pad, after people work after the flat ground, casting C15 concrete cushion layer, and then released according to the size of foundation base line, the laying of 240 mm thick solid brick tire mold,

Building height of tower crane foundation pile caps is highly again over 10 cm extra high water storage, In order to ensure concrete curing cycle), and wipe 20mm cement mortar on the inside. The junction between the tower crane foundation cap and engineering pile shall be separated by 50mm foam plate.

MCR295 H16 Tower Crane Lease Rent Hire

2. Technicians are required to strictly inspect and supervise the construction of steel reinforcement, concrete and brick mould for tower crane foundation. The project technical person in charge and safety officer shall apply for concealed acceptance visa for foundation engineering, including foundation positioning, pile foundation soil bearing layer acceptance, embedded anchorage of tower crane and concealed acceptance visa for steel reinforcement, etc.

MCR295 H16 Tower Crane Lease Rent Hire

3. Relevant pile foundation and foundation concrete construction shall be implemented according to the current construction acceptance specifications. The concrete must be vibrated and compacted with vibrator, and the concrete surface must be leveled strictly to ensure the quality of foundation structure.

4. Concrete casting shall be reserved and a group of specimens shall be sent to the laboratory for inspection.

5. according to the requirements of the tower crane lightning grounding device.

6. If there is anything not specified in this scheme for safe and civilized construction, relevant codes and regulations of shenyang municipality shall be implemented.

MCR295 H16 Tower Crane Lease Rent Hire

 

TOWER CRANE USED

LIEBHERR TOWER CRANE USED

TEREX TOWER CRANE USED

SYM TOWER CRANE USED

SCM TOWER CRANE USED

YONGMAO TOWER CRANE USED

COMEDIL TOWER CRANE USED

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right