MCH 120 Tower Crane Lease Rent Hire

  • MCH 120 Tower Crane Lease Rent Hire
  • MCH 120 Tower Crane Lease Rent Hire
  • MCH 120 Tower Crane Lease Rent Hire
MCH 120 Tower Crane Lease Rent Hire
  • Famous Global
  • Global
  • 5 to 50days
  • as u need units

Lesotho used Tower Crane, Madagascar used Tower Crane, the Comoros used Tower Crane , Mauritius used Tower Crane, La Reunion (French) used Tower Crane, St. Helena United Kingdom used Tower Crane

MCH 120 Tower Crane Lease Rent Hire

Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,

Model,

Jib length,   m

Max load,   Ton

Tip load,    Ton

Type, Stationary , Inter climbing ,Travelling,

And other Famous brand, Model ,  Depend on the brand , Model Ability , Year , Height and etc u want.

We have large units store.  From 6Ton to 20Ton. Store and Service all over the world.

 

Mean time , We supply all the Spare Parts U may need as follow,

Masts Section ,  Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.

MCH 120 Tower Crane

SPARE PARTS

MAST SECTION

MCH 120 Tower Crane Lease Rent Hire

Tower Crane Knowledge sharing:

Common problems and construction techniques in tower crane foundation construction

The stability of the tower crane foundation is of vital importance. Its huge body is composed of steel structure. In addition, the tower crane foundation has to bear a very large weight to lift the very heavy goods. Then, what problems should be paid attention to in tower crane foundation construction

MCH 120 Tower Crane Lease Rent Hire

Common problems in tower crane foundation construction:

One part of the site in order to seize the construction period, in the case of insufficient concrete strength and hasty installation, so that the tower crane bearing more than the limit of the ground stress, thus collapse, tipping over the unfortunate events

 

MCH 120 Tower Crane Lease Rent Hire

In some construction units, the excavation near the foundation of the tower crane results in landslide and even displacement, which leads to tower crane accident.

In recent years, the excessive pumping of groundwater in many cities in China has resulted in the formation of groundwater funnels, which have caused uneven subsidence and affected the operation and construction of tower cranes.

Construction technology of tower crane foundation

The construction unit in the tower crane foundation, must ensure that the endurance in line with the design requirements, the strength of reinforced concrete at least 80% of the design value.

MCH 120 Tower Crane Lease Rent Hire

For tower crane foundations with basement works, special measures should be taken, such as piling under the foundation, and welding the reinforcement at the pile end and the foundation foundation bolts together firmly. The bottom of the concrete foundation shall be leveled and rammed, and the bottom of the foundation shall not be made into a pot bottom.

The size error of foundation bolts must be strictly in accordance with the requirements of the foundation drawing construction, foundation bolts to maintain sufficient length of the exposed ground, each foundation bolts to double nut pre-tightening.

 

MCH 120 Tower Crane Lease Rent Hire

The surface of the foundation shall be treated before installation to ensure that the levelness of the foundation shall not exceed 1/1000. At the same time, the tower crane foundation shall not accumulate water, which will cause uneven settlement of the tower crane foundation. No pit or trench shall be dug in the vicinity of the tower crane foundation

 

 

TOWER CRANE USED

LIEBHERR TOWER CRANE USED

TEREX TOWER CRANE USED

SYM TOWER CRANE USED

SCM TOWER CRANE USED

YONGMAO TOWER CRANE USED

COMEDIL TOWER CRANE USED

 


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right