MC78 Tower Crane Lease Rent Hire
- Famous Global
- Global
- 5 to 50days
- as u need units
Indonesia used Tower Crane, East Timor used Tower Crane
MC78 Tower Crane Lease Rent Hire
Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,
Model,
Jib length, m
Max load, Ton
Tip load, Ton
Type, Stationary , Inter climbing ,Travelling,
And other Famous brand, Model , Depend on the brand , Model Ability , Year , Height and etc u want.
We have large units store. From 6Ton to 20Ton. Store and Service all over the world.
Mean time , We supply all the Spare Parts U may need as follow,
Masts Section , Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.
MC78 Tower Crane Lease Rent Hire
Tower Crane Knowledge sharing:
The following work should be done for the daily maintenance of the tower crane
Doing well the daily maintenance work of tower crane can effectively reduce the probability of tower crane accidents. At the same time, we should strengthen the safety education and publicity of tower crane, and the user has the right and obligation to urge the operator to do well the daily maintenance work of tower crane, in order to protect their own interests.
MC78 Tower Crane Lease Rent Hire
For the daily maintenance of the tower crane summarized the following 13, to do the daily maintenance of the tower crane, should do the following work, and the table, quantification, to be operable
MC78 Tower Crane Lease Rent Hire
(1) check the brake of each mechanism, must work reliably and brake flexible, there should be no dirt on the friction surface
(2) check whether all wires and cables are damaged, and wrap or replace the damaged parts in time
(3) check whether the safety devices are reliable and sensitive, and never work with illness
(4) check whether each wire rope has broken wire and wear, if there is broken wire wear more than the provisions of the timely replacement
MC78 Tower Crane Lease Rent Hire
(5) keep the whole machine clean and timely clean up sundries and dirt of all agencies
(6) check the oil quantity of each reducer. If the oil level is lower than the specified height, it should be supplemented in time. The transmission pulley should be oiled frequently to maintain the lubrication and flexibility of the transmission
(7) check the tightness of connection bolts of each standard joint, and check whether there are cracks in welding seams of welding parts
(8) check whether the operation of all institutions is normal and whether there is any noise. If any fault is found, it must be removed in time
(9) check whether the component has yield deformation, and replace it if so
(10) each transmission mechanism must have a protective cover, which cannot be removed at will
(11) regularly check whether there is a large amount of corrosion of structural parts
(12) regularly check the connection bolts and welding seams of structural parts, as well as whether the components are damaged, deformed or loose
(13) the limit switch contacts of all safety devices must be opened and closed reliably, and the contact arc pit should be polished.
MC78 Tower Crane Lease Rent Hire
USED LIEBHERR TOWER CRANE
USED TEREX TOWER CRANE
USED SYM TOWER CRANE
USED SCM TOWER CRANE
USED YONGMAO TOWER CRANE
USED COMEDIL TOWER CRANE
LIEBHERR TOWER CRANE USED
TEREX TOWER CRANE USED
SYM TOWER CRANE USED
SCM TOWER CRANE USED
YONGMAO TOWER CRANE USED
COMEDIL TOWER CRANE USED