MC320A K16 Tower Crane Lease Rent Hire
- Famous Global
- Global
- 5 to 50days
- as u need units
Senegal used Tower Crane, Gambia used Tower Crane, Mali used Tower Crane
MC320A K16 Tower Crane Lease Rent Hire
Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,
Model,
Jib length, m
Max load, Ton
Tip load, Ton
Type, Stationary , Inter climbing ,Travelling,
And other Famous brand, Model , Depend on the brand , Model Ability , Year , Height and etc u want.
We have large units store. From 6Ton to 20Ton. Store and Service all over the world.
Mean time , We supply all the Spare Parts U may need as follow,
Masts Section , Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.
MC320A K16 Tower Crane Lease Rent Hire
Tower Crane Knowledge sharing:
Characteristics and application of tower crane split reinforced concrete foundation
This paper describes the characteristics and application of tower crane split reinforced concrete foundation.
Tower crane split reinforced concrete foundation
MC320A K16 Tower Crane Lease Rent Hire
Before the installation of the tower crane, the construction unit shall, in accordance with the requirements of the operation manual of the tower crane and the geological conditions of the installation site, conduct a corresponding review of the foundation bearing capacity of the tower crane foundation to ensure the safety of the installation and use of the tower crane.
The bearing capacity of foundation varies greatly in different regions, so we must check the bearing capacity of foundation under the concrete foundation of tower crane. When the bearing capacity of foundation fails to meet the strength requirements specified in the specification, additional pile foundation and other corresponding technical measures should be adopted to make up for it.
MC320A K16 Tower Crane Lease Rent Hire
A split reinforced concrete foundation may also be used for a fixed tower crane with a cross beam base. The four corners of the bottom frame of the cross beam of the tower crane are respectively installed on the foundation of four pieces of reinforced concrete. The size of concrete should be determined according to the strength of foundation under concrete foundation.
The side length and height dimension of the concrete foundation shall be determined according to the requirements of the operation manual of the tower crane of different types. The steel reinforcement in the split concrete foundation must be carried out according to the instruction. If there are special requirements, the construction unit should carry out the strength design, and provide specific technical documents to implement the construction.
With the heavy technology as the background, the high-level enterprise culture will be integrated into the life of the staff, the thick ink depicts the people-oriented management concept, the real gold forging crane industry backbone.
MC320A K16 Tower Crane Lease Rent Hire
TOWER CRANE USED
LIEBHERR TOWER CRANE USED
TEREX TOWER CRANE USED
SYM TOWER CRANE USED
SCM TOWER CRANE USED
YONGMAO TOWER CRANE USED
COMEDIL TOWER CRANE USED