MC310 K16 Tower Crane Lease Rent Hire
- Famous Global
- Global
- 5 to 50days
- as u need units
Monaco used Tower Crane
Romania used Tower Crane, Bulgaria used Tower Crane
MC310 K16 Tower Crane Lease Rent Hire
Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,
Model,
Jib length, m
Max load, Ton
Tip load, Ton
Type, Stationary , Inter climbing ,Travelling,
And other Famous brand, Model , Depend on the brand , Model Ability , Year , Height and etc u want.
We have large units store. From 6Ton to 20Ton. Store and Service all over the world.
Mean time , We supply all the Spare Parts U may need as follow,
Masts Section , Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.
MC310 K16 Tower Crane Lease Rent Hire
Tower Crane Knowledge sharing:
Operation technology of standard bolt connection of tower crane and matters needing attention in inspection
First, after the initial installation of the tower crane should be operated for 2 shifts, the fastening condition of all the connecting bolts should be checked once, and in the next half month or so, and the key inspection of the bolts at the above parts should be conducted after the lifting of the tower.
MC310 K16 Tower Crane Lease Rent Hire
It is also necessary to rotate the position of the tower arm during inspection. The bolts being checked are directly below the position of the balance arm, so that it is credible and effective to check whether the bolts are tightened.
Second, the tower crane work, a set of connection when the same joint pre-tightening force is too large, the deputy of axial force of bolt connection can vary widely, big bolt pretightening under heavy load for a long time, easy to produce fatigue fracture, were also found in the actual examination eight foundation bolt of a fracture, belong to this phenomenon.
MC310 K16 Tower Crane Lease Rent Hire
Pay attention to the consistency of pre-tightening torque during installation, and in field operation, due to the different strength of workers, it is very likely that the pre-tightening torque of the four column bolts is different, the use of torque wrench can be well controlled, to say the least, should also be checked and adjusted by experienced foreman fastening.
Third,when the tower crane is transferred to the field, all the connecting bolts of the tower body shall be inspected, derusted and lubricated in detail, and any abnormality such as crack, wear, severe corrosion, overall or local plastic deformation shall be replaced. It is recommended that it should not be used more than twice to avoid fatigue damage. This requirement, existing tower crane probably majority did not achieve.
MC310 K16 Tower Crane Lease Rent Hire
If discover when be short of, be short of, unfavorable and proper processing is made, because building unit is opposite, the processing quality of high-strength bolt, material is not easy control, appropriate buys to former tower crane manufacturing plant had better, high-strength bolt should manufacturer mark, grade mark.
MC310 K16 Tower Crane Lease Rent Hire
LIEBHERR TOWER CRANE USED
TEREX TOWER CRANE USED
SYM TOWER CRANE USED
SCM TOWER CRANE USED
YONGMAO TOWER CRANE USED
COMEDIL TOWER CRANE USED