MC125 Tower Crane Lease Rent Hire

  • MC125 Tower Crane Lease Rent Hire
  • MC125 Tower Crane Lease Rent Hire
  • MC125 Tower Crane Lease Rent Hire
MC125 Tower Crane Lease Rent Hire
  • Famous Global
  • Global
  • 5 to 50days
  • as u need units

Moldova used Tower Crane
Poland used Tower Crane, the Czech Republic used Tower Crane

MC125 Tower Crane Lease Rent Hire

Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,

Model,

Jib length,   m

Max load,   Ton

Tip load,    Ton

Type, Stationary , Inter climbing ,Travelling,

And other Famous brand, Model ,  Depend on the brand , Model Ability , Year , Height and etc u want.

We have large units store.  From 6Ton to 20Ton. Store and Service all over the world.

 

Mean time , We supply all the Spare Parts U may need as follow,

Masts Section ,  Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.

MC125 Tower Crane

SPARE PARTS

MAST SECTION

MC125 Tower Crane Lease Rent Hire

Tower Crane Knowledge sharing:

Safety supervision and installation signal of QTZ40 tower crane

QTZ40 tower crane installation technology, the design of concrete foundation used by QTZ40 tower crane should meet the anti-overturning stability and strength conditions. For the rigid shallow foundation, it meets the requirements of anti-overturning stability: the overturning moment standard value is not less than the overturning moment design value.

 

MC125 Tower Crane Lease Rent Hire

For composite pile foundation, it is also required that the standard value of overturning moment should not be less than the design value of overturning moment. The overturning moment is generated when the pile is pulled out, so the anti-overturning stability of composite pile foundation is to check and calculate the anti-overturning stability of composite pile foundation.

Safety supervision

1. Assist the general commander in charge of site safety.

2. No potential safety hazards shall be found on the inspection site, and supervise the installation and dismantling personnel to wear labor protection articles neatly.

3. Check the roadbed and tower body for potential safety hazards.

4. Supervise the use of qualified sling, correct hoisting and protection.

Install the signal

The tower command

MC125 Tower Crane Lease Rent Hire

1. Responsible for tower hook and entrance and exit command. It is required to know the lifting weight, select the hanging position and select the sling correctly.

2. Be responsible for the connection quality of the tower body, and require that the tightening torque of the bolt reach the standard, the pin is complete and in place, and the cotter pin is pried open.

3. Responsible for the connection quality between the tower tip and the pull plate and the front and rear arms during installation; Tower demolition command and supervision in order to dismantle the tower.

4. The staff on the control tower disassemble and assemble according to the regulations.

The ground hook

1. Responsible for ground hook during installation. Requires to know lifting point and lifting weight, the correct choice of lifting and locking。

2. Before lifting the front and rear arms, check the pull plate and the big arm interface for hidden dangers.

MC125 Tower Crane Lease Rent Hire

 

 

LIEBHERR TOWER CRANE USED

TEREX TOWER CRANE USED

SYM TOWER CRANE USED

SCM TOWER CRANE USED

YONGMAO TOWER CRANE USED

COMEDIL TOWER CRANE USED

 

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right