MC115B Tower Crane Lease Rent Hire
- Famous Global
- Global
- 5 to 50days
- as u need units
Nauru used Tower Crane, Kiribati used Tower Crane, Tuvalu used Tower Crane, Samoa used Tower Crane, Fiji used Tower Crane, Tonga used Tower Crane, Cook Islands new used Tower Crane,
MC115B Tower Crane Lease Rent Hire
Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,
Model,
Jib length, m
Max load, Ton
Tip load, Ton
Type, Stationary , Inter climbing ,Travelling,
And other Famous brand, Model , Depend on the brand , Model Ability , Year , Height and etc u want.
We have large units store. From 6Ton to 20Ton. Store and Service all over the world.
Mean time , We supply all the Spare Parts U may need as follow,
Masts Section , Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.
MC115B Tower Crane Lease Rent Hire
Tower Crane Knowledge sharing:
Chapter two installation position, foundation bearing capacity and adhesion condition
We from the tower crane installation safety technical article first chapter: personnel responsibilities and basic requirements, understand that to ensure the security of tower crane installation, who is the primary factor, secondly, in the process of tower crane installation of tower crane installation environment selection process and installation with the choice of materials is related to whether the tower crane installation smoothly.
this article, the factory from the tower crane installation location selection and foundation bearing and adhesion conditions, surrounding obstacles of tower crane installation from such aspects as security.
MC115B Tower Crane Lease Rent Hire
I. selection of installation location of tower crane
All factors affecting the safe operation of the tower crane shall be taken into consideration in the selection of installation location, with special attention to the following points
A) bearing and adhesion conditions of foundation
B) other risk factors at and near the site
C) the influence of wind force in working or non-working conditions
D) meet the requirements of installation, erectionspace and transportation channel
Bearing and adhesion condition of foundation
The designee shall ensure that the foundation bearing capacity and attachments at the installation site are capable of bearing the loads imposed by the tower cranes in working and non-working conditions. When the crane is installed close to the foundation of an existing or upcoming building, the designee shall ensure that the foundation has been treated in accordance with the design requirements.
MC115B Tower Crane Lease Rent Hire
During installation or use, when the foundation near the tower crane is affected by other construction, the designer shall be consulted in time to maintain the whole or part of the tower crane foundation. No matter the track foundation, special foundation or fixed foundation is installed, the tolerance of the foundation shall meet the requirements for the installation and use of tower cranes.
When adhesion is required, the adhesion structure shall be designed and selected in accordance with the manufacturer's requirements or the calculation results confirmed by the competent engineer, and the bearing capacity of the adhesion structure and the attachment shall be checked.
Fixed basis
When the fixed foundation is installed, the size of the fixed foundation should meet the stability requirements of the working state and non-working state of the tower crane as well as the bearing capacity of the foundation.
MC115B Tower Crane Lease Rent Hire
Fixed foundations shall be designed by professional engineers. When the foundation of the design requires lowering the independent height of the tower crane, the maximum allowed independent height shall be clearly marked in the design document and be ensured to be carried out according to it.
Rail base
Track selection and laying shall be in accordance with the manufacturer's instructions and GB 5144 requirements. Materials are not allowed to be stored on the track (inside). It is recommended to adopt enclosure enclosure for the whole track range to prevent unauthorized personnel from entering.
MC115B Tower Crane Lease Rent Hire
Special measures should be taken to prevent collisions and interference with the track when there is a need for vehicles to pass through the track. Tracks shall not be used for welding unless approved by a metallurgist. When calculating the stability of the whole machine, the beneficial effect of wind - resistant and skid - resistant anchoring device should not be recorded.
The track shall be inspected regularly (no more than 1 month at the longest), and abnormal conditions such as out-of-tolerance and suspension shall be dealt with immediately.
In any need or non-working state should be timely locking wind anti-skid anchor device.
When special foundation such as steel structure platform is needed, the designated personnel shall ensure that the foundation is designed by professional engineers and can meet the requirements of tower crane.
Three, the surrounding obstacles
MC115B Tower Crane Lease Rent Hire
The site selection of tower crane installation should fully consider the influence of surrounding obstacles on tower crane operation and operation, such as nearby buildings, other tower cranes, public places , and public transportation areas . When the tower crane and its load can not avoid such obstacles, should consult the relevant government departments.
Tower crane foundation should avoid any underground facilities, unable to avoid, underground facilities should take protective measures to prevent disasters and accidents.
Overhead electrical lines and cables
The safe distance of tower cranes from overhead cables shall meet the requirements of GB 5144. Live cables which cannot be confirmed as unlive shall be considered live, and those which cannot be confirmed as low voltage shall be considered high voltage. When the requirements cannot be met, practical protective measures shall be taken and approved by the relevant departments.
Tower crane management near airports/airports and air routes
When a tower crane is installed or used near an air station/airport or air route, the designated person should inform the relevant authorities and obtain permission.
Tower crane management in high magnetic field area
When the tower crane in strong magnetic field (such as TV stations, towers, radar station nearby, etc.) install and use, protection measures should be taken to prevent the tower crane operation are designated cutting lines of magnetic force generation and harm the people.
Not for tower crane control system shall confirm the magnetic field should pay special attention to when using remote control.
TOWER CRANE USED
LIEBHERR TOWER CRANE USED
TEREX TOWER CRANE USED
SYM TOWER CRANE USED
SCM TOWER CRANE USED
YONGMAO TOWER CRANE USED
COMEDIL TOWER CRANE USED