H20 Mast Section Terex Comedil Tower Crane

  • H20 Mast Section Terex Comedil Tower Crane
  • H20 Mast Section Terex Comedil Tower Crane
  • H20 Mast Section Terex Comedil Tower Crane
H20 Mast Section Terex Comedil Tower Crane
  • ZCJJ
  • China
  • 10days
  • 50sets

COMEDIL AC 55-3 Mast section
COMEDIL AC 60-3 Mast section
COMEDIL AC 100-4 Mast section

Products Specification

Type , Model: H20 Mast Section Terex Comedil Tower Crane

Size: 1.9mx1.9mx3.75m 

Use for : Terex Comedil Tower Crane (H20A , H20B)

Materials: Q345B

Within bolts, Ladder, Platform

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

H20 Mast Section

Terex H20 Mast Section

 

 

H20 Mast Section Terex Comedil Tower Crane

 

Tower Crane Knowledge sharing:

Reference for detailed construction plan of tower crane installation and removal

According to a residential construction project as an example, on the tower crane installation, demolition of the detailed construction scheme, for the majority of tower crane users for reference.

I. project overview

This project is a residential area. Year, month, day, model: QTZ40 tower crane, number: . The project is an 11-storey frame structure with a total construction area of 3,410.85m. For completion.

Technical performance of tower crane

Serial number name unit parameter QT400 remarks

Lifting moment kn.m 400

Maximum rated weight t 4

3 working range m 2.5-47

4 lifting height (free-standing) m 29

5 Lifting height (attachment) m 120

6 lifting speed m/min 25/12.5

7 rotary speed m/min 0.37

8 amplitude changing speed m/min 33/22

9 jacking speed m/min 0.6

10 Dead weight of tower crane t 10.9

11 equilibrium weight T 2.2

12 base frame width m 3.9*3.9

13 Maximum radius of gyration m 30.8

14 Maximum working speed: m/s 20

15 jacking operation wind speed (not greater than) m/s 13

Minimum operating temperature 0 C -20

 

H20 Mast Section Terex Comedil Tower Crane

 

Installation and disassembly of tower crane

Fixed jack-up tower crane installation, the most suitable hoisting machinery is truck crane, hoisting flexible, large mobility, this project USES a 25T truck crane hoisting.

1. Preparation before installation

(1) understand site layout and soil condition, and clear obstacles.

(2) determine the laying location of concrete foundation according to the layout of the building, and carry out foundation setting according to the technical requirements specified in the concrete foundation drawing.

The foundation must be tamped down to withstand a load of 0.2Mpa .

determine the location of concrete foundation, should consider tower crane operation, lifting boom for 3600 full rotary space without obstacles and high and low voltage wire.

(1) to determine the location of concrete foundation, should consider tower crane jacking or falling, whether before or after the construction, the lifting boom and balance arm through the space should not be air obstacles.

(4) concrete foundation casting, should be in accordance with the relevant building standards for maintenance, in the maintenance period, is prohibited from tower crane installation. prepare hoisting machinery and sufficient steel wire rope, rope buckle, wire, sleepers and other common tools.

2. Requirements for installation and disassembly

(1) the installation and disassembly of tower cranes shall be carried out in accordance with the requirements and sequence specified in the instruction manual and under the command of a special person.

(2) in the process of installation and disassembly, operators working at height should wear safety helmet and safety belt, and operators working on the ground should wear safety helmet.

(3) the connecting pin shaft, fastening bolt and nut between the components of the tower crane must use the random special connecting fasteners of the manufacturer, and shall not be substituted arbitrarily.

(4) after the assembly of the tower crane, the cotter pins on the connecting pin shafts must be opened, the shaft end clamp plate must be tightened, and the nuts on the connecting bolts must be tightened as required by the tightening torque, and the lock nut must be tightened.

The connection and fastener shall be coated with appropriate anti-rust oil.

 

H20 Mast Section Terex Comedil Tower Crane

 

(5) during installation, cut off the general power supply of the ground when conducting electrical wiring operations.

(6) when the tower crane is installed, the wind speed shall be lower than grade 4 (the wind speed shall be lower than 7.9m/s).

(7) for the installation of multiple tower cranes, they shall be staggered at different heights to avoid collision accidents between tower cranes, or set rotation limiters. 4. The edge of the foundation foundation is 5m away from the building.

The center distance of the four bases is 3.9m.

Fourth, the subgrade

The soil quality of the foundation shall be firm and solid, the elevation of the concrete foundation shall not be lower than C30, the compressive load of the concrete foundation shall not be less than 30t/m 2, the surface flatness eThe tower is vertical and stable

rror of the concrete foundation shall not be more than 1/500, cast iron pieces and sand bags shall be reused for compression, and concrete can also be used for pouring.

(1)   , installation chassis: the chassis is placed on the concrete foundation platform, mount clamp, tighten the anchor bolts, measuring the four flange on the chassis and four inclined strut the levelness of the bearing, and within the prescribed tolerance.

If error criterion based with a wedge between the contact surface of the chassis and adjust the block and iron etc, note pad must be pad, pad in mind, not allowed to block any possible loose, and the double locking nut is tightened.

(2), installation base section, section, set the base section hoisting frame, the chassis with special bolt and nut connected with the base section, then the workpiece standard section, the standard section with bolt connection, lifting set, the set of shelves of climbing the adjustment of the wheel in the largest size.

 

H20 Mast Section Terex Comedil Tower Crane

 

(3) and install rotary assembly under the table, slewing bearing and on the table (including the slewing mechanism), turning the tower in front of the tower crane installation, the above parts assembly first, then the integral lifting to the set of shelves,

For four main strings on the turntable and the seam allowance on the standard section, pin shaft and set, and the turntable and standard under section with bolt connection is good.

(5) install the top of the tower: install the platform, railings and escalator on the top of the tower on the ground before hoisting, then hoist the top of the tower onto the rotating tower body, and connect the rotating tower body with the upper turntable with a pin

Balance arm assembly

(6) , installed on the ground to balance arm assembly is good, the lifting mechanism, electric cabinet, resistance box, balance arm pull rod on balance arm, and is connected to, lift balance arm  balance arm is equipped with four install lug  the balance arm and rotary tower with pin hinge and wear good split pin.

Then will invite high balance arm gradually until balance arm pull rod hinged with a pin shaft and wear good split pin, then slowly will balance arm down, lifting a counterbalance installed in balance arm again at the rear.

 

H20 Mast Section Terex Comedil Tower Crane

 

(7) install the driver's cab. After the electrical equipment in the driver's cab is fully installed, lift the driver's cab onto the upper turntable and lean against the front end of the platform, align it with the hole on the earplate, and then fix it with screws.

Lift arm assembly (8), installed near the tower crane smooth sleepers, assembled a good jib, parked his jib at about 0.6 m high on stents timber, the range of cars in a gibbet roots, minimum amplitude transformer car and tighten the rope to the car under the condition of load relaxation advisable

Factory luffing mechanism has been mounted on the crane boom lifting point wearing a split pin, a hinge pin shaft is placed within the upper chord of hoist boom positioning bracket, and the wire tightly, check whether the circuit on the gibbet.

(10) install the balance weight according to the model of the tower crane. The proportion and installation position of the balance weight shall be installed in strict accordance with the requirements.

Then the connecting plate, bolts and each balance weight shall be connected in series and loaded into the spring coil, and the nuts shall be tightened. After the hoisting is completed, the hoisting rope shall be wound and released from the hoisting mechanism reel.

After passing the upper guide pulley on the tower top, the rope shall be lowered into the lifting restraint pulley on the rotary tower body, and the pulley shall be moved forward, then wound to the variable amplitude trolley and the pulley block of the hoisting hook.

Finally, the rope head shall be fixed on the device of the lifting arm head with the pin shaft through the wedge sleeve.

 

 

 

Terex Comedil Tower Crane

COMEDIL CTT721  Mast section
COMEDIL CTL630  Mast section
COMEDIL CTT561-32  Mast section
COMEDIL CTL340  Mast section
COMEDIL CTL400  Mast section
COMEDIL CTT561-24  Mast section
COMEDIL CTT561  Mast section
COMEDIL CTL430  Mast section
COMEDIL CTL260  Mast section
COMEDIL CTT331  Mast section
COMEDIL CTL180  Mast section
COMEDIL CTT231  Mast section
COMEDIL CTT191  Mast section
COMEDIL CTL140  Mast section
COMEDIL CTL130  Mast section
COMEDIL CBR40  Mast section
COMEDIL CBR36  Mast section 
COMEDIL CBR32  Mast section 
COMEDIL CTT 182  Mast section

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right