132HC Mast Section Liebherr Tower Crane
- ZCJJ
- China
- 10days
- 50sets
71EC-B5FR FR TRONIC Mast section
85EC-B5 Mast section
85EC-B5 FR TRONIC Mast section
Products Specification
Type , Model: 132HC Mast Section for Liebherr Tower Crane
Size: 1.8mx1.8mx2.5m
Use for : Liebherr Tower Crane (132HC , 154HC)
Materials: Q345B
Within bolts, Ladder, Platform
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
132HC Mast Section Liebherr Tower Crane
Tower Crane Knowledge sharing:
Demolition scheme of QTZ63 tower crane: preparation work, demolition process, safety technical measures
1) the disassembly and installation team must have the qualification of disassembly and installation of vertical transport equipment. The disassembly and installation personnel shall be trained and hold a certificate.
When disassembly and installation, they must wear safety helmet, safety belt and other protective equipment and strictly abide by safety operation rules.
2) two warning lines are arranged in and around the demolition and installation operation area. 20m warning signs are hung on the left and right sides of the safety protection. No one is allowed to enter the operation area or watch around.
132HC Mast Section Liebherr Tower Crane
3) the demolition operation should be carried out when the wind force is lower than level 4, and listen to the weather forecast in time. In case of sudden strong wind and heavy rain above level 4, the operation should be stopped and emergency preventive measures should be taken.
4) operators must follow the unified command, and any good methods and Suggestions must be submitted for discussion, and can only be implemented with the consent of the field commander, and shall not change the operation plan on their own initiative.
5) when working at height, all the tools must be placed in the tool kit, and should not be placed randomly. The tools should be tied with string and fastened on the fasteners, and the party handing over the tools should not let go until the party receiving the tools grasps them, and should not throw them arbitrarily.
6) the inspection must be stopped immediately if any fault occurs during the descending process of the tower crane, and the descending action shall not be continued unless the truth is found out and the fault is removed.
7) when the tower crane hydraulic pressure drops, please pay attention to observe whether there are dissoldering and cracks in the weld joint of the tread and the gripper of the beam. If there are, please stop the machine immediately for repairing before descending.
8) the tower crane shall be anchored immediately after the end of each day's operation, and the power supply of the hydraulic system shall be cut off to protect the climbing holes reserved for the lower structure. 9) pay attention to the correct position of lifting point.
10) the crane should be placed in a flat position with an Angle. No one is allowed to work nearby. When removing and installing the tower cap, the crane should be selected at the inner cover (top of the tower) or the steel plate on the top
132HC Mast Section Liebherr Tower Crane
11) the key parts of the bolts must be tightened.
12) when removing the balancing arm, the laying point must be selected in accordance with the requirements of this lifting instruction to ensure balance. When disassembling the connecting pin shaft, the position must be selected to prevent injury accidents caused by extrusion, collision and picking.
When disassembling and finding faults, the operation shall be stopped immediately.
13) when the tower is dismantled, it is strictly forbidden to loosen and remove the big bottom bolts before the steel wire rope of the lifting member collapses.
14) crane operators must hold a license to work, control the boom height - 8 - degree and rotation radius in the operation, and the construction crane operators must hold a license to work, control the boom height and rotation radius in the operation, and keep more than 2 meters with the scaffolding outside the building and the high-tension wire shield frame.
15) strictly abide by the technical safety operation rules. During tower demolition, it is strictly prohibited for tower cranes to carry out other operations from the crane. When the tower body below positive and negative zero is removed, attention should be paid to whether the foundation pit slope has cracks, seepage and loosens to prevent collapse accidents.
132HC Mast Section Liebherr Tower Crane
16) the wastes in tower demolition operations, including hazardous materials in the wastes, shall not be abandoned on the site, and shall be placed in the designated place
Tower crane hoisting scheme for working environment, safe operation and multi-tower operation
Before the lifting and hoisting of tower cranes, it is necessary to have a comprehensive understanding of the working site environment, passing routes, overhead wires, the weight and distribution of buildings and components, etc.
Safety precautions during operation/after operation: when multiple tower cranes are operating at the same time, they shall strictly comply with the code for simultaneous operation of multiple tower cranes.
I. preparation basis
1.1 current building construction code
1.2 operation rules for common construction machinery
1.3 disclosure of safety technology
1.4 construction organization design
Three, this project will erect 7 tower cranes, tower crane types are 6 QTZ40 tower crane, 1 QTZ63 tower crane.
Understanding of the working site environment, passing routes, overhead wires, weight and distribution of buildings and components. Hoisting operation regulations are as follows
1. There shall be enough working area for tower crane operation, and there shall be no obstacles in the half diameter of the lifting boom and the swing.
2. Key inspection before operation
1) appearance of the mechanical structure, the transmission mechanism should be normal.
2) the oil level of each gear box and hydraulic oil tank shall meet the standards.
3) the connection bolts of the main parts shall not loosen.
4) the abrasion of the tower crane wire rope and the wearing and winding pulley shall comply with the provisions.
5) the power supply cable shall be free from wear.
6) check whether the power supply voltage reaches 380V, and the variation range shall not exceed 20V. The starting control switch should be at zero before power transmission. Switch on the power and check the metal structure for no leakage before operation.
7) no-load operation, check the brakes, safety limits and protective devices of various institutions such as walking, slewing, lifting and amplitude changing before operation.
3, in the operation, the operator should be carried out in the tower crane walking, slewing, lifting hook, amplitude, etc.
132HC Mast Section Liebherr Tower Crane
4. The commanding personnel of tower cranes must be trained and qualified before they can serve as the commanding staff. Work closely with operators.
The operator should strictly follow the command personnel's signal, if the signal is unclear or wrong, the operator should refuse to execute.
5. When the operation room is far away from the ground and the normal command is difficult, two commanding personnel at high altitude and on the ground or other effective contact methods can be used for command.
Liebherr Tower Crane
L1-24 Mast section
13HM.1 Mast section
22HM.1 Mast section
34K Mast section
42K.1 Mast section
53K Mast section
65K.1 Mast section
81K.1 Mast section
120K.1 Mast section
MK88 Mast section
MK140 Mast section
202EC-B10 LITRONIC Mast section
250EC-B12 LITRONIC Mast section
285EC-B12 LITRONIC Mast section
380EC-B12 LITRONIC Mast section
380EC-B16 LITRONIC Mast section
1000EC-B100 LITRONIC Mast section
1000EC-B125 LITRONIC Mast section
200EC-H10 LITRONIC Mast section
280EC-H12 LITRONIC Mast section
280EC-H16 LITRONIC Mast section
550EC-H20 LITRONIC Mast section
550EC-H40 LITRONIC Mast section
630EC-H40 LITRONIC Mast section
630EC-H50 LITRONIC Mast section
630EC-H70 LITRONIC Mast section
1000EC-H40 LITRONIC Mast section
1000EC-H50 LITRONIC Mast section
180HC-L8/16 LITRONIC Mast section
280HC-L12/24 LITRONIC Mast section
280HC-L16/28 LITRONIC Mast section
357HC-L12/24LITRONIC Mast section
357HC-L18/32 LITRONIC Mast section
542HC-L12/24 LITRONIC Mast section
542HC-L18/36 LITRONIC Mast section
710HC-L25/50 LITRONIC Mast section
710HC-L32/64 LITRONIC Mast section
1250HC40 Mast section
1250HC50 Mast section
2000HC60 Mast section
3150HC60 Mast section
3150HC70 Mast section
4000HC70 Mast section
4000HC80 Mast section
4000HC100 Mast section
5000HC80 Mast section
32TTR Mast section
100 LC 6 Mast section
154 EC-H 6 Litronic Mast section
180 EC-H 10 Litronic Mast section
1800 C 60 Mast section
200 HC 10 Mast section
290 HC 12 Mast section
316 EC-H 12 Mast section
316 EC-H 12 Litronic Mast section
390 HC 16 Mast section
420 EC-H 16 Mast section
630 EC-H 20 Litronic Mast section
630 EC-H 20 Litronic Mast section
850 C 20 Mast section
1000 EC-H 40 Litronic Mast section