Tower crane is a large mechanical equipment. There are strict audit procedures for the installation, disassembly and use of tower crane. Therefore, the tower crane on the construction site must have complete technical data and safety data before construction. According to the requirements, the tower crane construction machinery factory (http://www.fx68.net) sorts out the general tower crane data as follows:


L68B3 Mast Section

L68B3 mast section is the best in this fieldL68B3 Mast Section



(1) tower crane production license, factory certificate, operation instruction, equipment file, operation and maintenance record, installation and removal plan, acceptance certificate, inspection report.




(2) qualification certificate of disassembly team, operation certificate and safety work certificate of equipment installation and disassembly personnel, commander, operator and other special operators.



L68B3 Mast Section

L68B3 mast section is the best in this field

L68B3 Mast Section

(3) the tower crane shall be hung with load limit sign, safety warning sign, operation procedure sign, acceptance pass sign and fixed person and machine sign.