L68B1 Mast Section What are the preparations for tower crane operation? How to prepare for operation?

06-12-2019

What are the preparations for tower crane operation? How to prepare for tower crane operation? Tower crane construction machinery factory (http://www.fx68.net) makes the following summary for the preparation before tower crane operation, and completes the preparation before tower crane operation to ensure the construction safety.


L68B1 Mast Section:

http://www.towercranesupply.com/product/l68b1-mast-section-for-tower-crane-mastsL68B1 Mast Section




1. Carefully read the instructions of tower crane, and the operator of tower crane must follow the requirements of different instructions.


2. Check whether the subgrade meets the requirements of the specification, and clean the track and subgrade without obstacles, so as to avoid cable breakage or tower crane derailment accident.


3. Check whether all safety devices are complete and effective. The inspection method should be carried out at the same time of no-load test run. It is not allowed to only check the integrity of safety devices and not carry out operation test as required.

L68B1 Mast Section:

http://www.towercranesupply.com/product/l68b1-mast-section-for-tower-crane-masts

L68B1 Mast Section

4. Conduct no-load test run, and conduct empty car test with different speed before using all kinds of operation actions of tower crane during construction. Pay attention to the transmission sound of all parts during test run.

L68B1 Mast Section:

http://www.towercranesupply.com/product/l68b1-mast-section-for-tower-crane-masts

L68B1 Mast Section

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy