L68B1 Mast Section tower crane accessories maintenance cycle

13-11-2019

Now, the maintenance cycle for crane fittings. The tower crane fittings are numerous, each fitting work function, the work role each has the difference, therefore the maintenance work should also from easy to difficult, carries on according to the system. The management should be systematized, the operation should be systematized and the command should be standardized. 


L68B1 Mast Section 

L68B1 mast section is the best in this fieldL68B1 Mast Section

The Red Maintenance of construction lift is divided into: daily maintenance, first-class maintenance, minor repair, intermediate repair, major repair. The maintenance work of tower crane is different due to the different structure of its type workers (SS type, SC type, etc.) , which requires strict daily maintenance. Daily maintenance is carried out in each shift, by the operator, the specific time can be carried out in the interval of the work shift, can also be carried out in the course of shift change. The maintenance must be cut off the power supply, so that the machine stop running. Once found that there are parts seriously worn, should be timely shutdown, shutdown, replacement.

L68B1 Mast Section 

L68B1 mast section is the best in this fieldL68B1 Mast Section



Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy