L68A1 Mast Section What are the commissioning and acceptance work after tower crane installation
tower crane installation after the commissioning, acceptance work what? Tower Crane must be installed after the field debugging, acceptance qualified before putting into use. After the tower crane installation debugging work: to carry out technical inspection, no-load test, load test, to ensure the safe use of tower crane. Every attached wall, jack-up plus section must also be strict acceptance, to ensure that the attached wall connection reliable and vertical tower requirements. Tower Crane acceptance by the construction unit equipment departments, Safety Departments, assembly and disassembly team, the project together, strictly in accordance with the content of the acceptance list item by item inspection acceptance.