L68A1 Mast Section Scrapping standard of tower crane brake replacement standard of tower crane brake
Tower crane brake is a power device, auxiliary tower crane operation, is an important tower crane accessories. What is the scrapping standard of tower crane brake? When should it be replaced?
L68A1 Mast Section:
http://www.towercranesupply.com/product/l68a1-mast-section-for-tower-crane-masts
Brake parts shall be scrapped in case of any of the following conditions:
(1) crack;
(2) the wear of the brake pad friction pad reaches 50% of the thickness of the raw material;
(3) the wear on the brake wheel surface is 5mm-2mm;
(4) the spring has plastic deformation;
(5) the empty stroke of lever system exceeds its rated stroke by about 10%.
L68A1 Mast Section:
http://www.towercranesupply.com/product/l68a1-mast-section-for-tower-crane-masts
Get the latest price? We'll respond as soon as possible(within 12 hours)
News
Products
Featured Products
Contact Details