L68A1 Mast Section dismantle the Tower Crane and the wall rod
dismantle the Tower Crane and the wall Rod, should first dismantle the wall Rod, then remove the attached wall frame. It is important to note that because the vertical degree of the tower body is adjusted by the attached Wall Pole, there is a certain internal force between the Tower Body and the attached wall pole. When the connection between the attached Wall Pole and the building is removed, the restraint of the tower body will be released and rebound will occur. Therefore, the homework staff must pay attention to the operation status of the insurance to prevent accidents. When the jack-up tower crane is disassembled, the hydraulic jack-up device should be first applied to lower the section and disassemble the standard section. When the height of the tower crane drops to the vicinity of the attachment device, the attachment wall installation can be removed.
L68A1 mast section is the best in this field