L48A1 Mast SectionTOWER CRANE MAINTENANCE

19-11-2019

Tower Crane technology-importance of tower crane maintenance In order to keep the tower crane running under the condition of high performance and safety, the maintenance work of the tower crane must be done well. Only in this way can we effectively prevent and reduce the tower crane in the work may appear failure, to ensure the integrity of the tower crane. 


L48A1 Mast Section

L48A1 mast section is the best in this fieldL48A1 Mast Section



The Tower Crane must be inspected and maintained in accordance with the regulations during installation, during use and after disassembly. 1. In the working state of the tower crane, it is often exposed to the wind, rain and the Sun. The dust and sand will fall to the various departments of the machinery. If it is not cleaned up and maintained in time, it will erode the machinery and shorten its life. 2. In the process of operation, the working mechanism lubrication parts of the oil and grease will lose after natural loss, if not repeated to make up, will increase the wear and tear of machinery. 3. After a period of time of use of the machinery, each of the working parts will wear out, the working clearance of the whole machine will change, if not maintained and adjusted in time, the wear of the working parts will accelerate Even lead to transport the idea of the complete damage. 4. In the running process of machinery, if the working mechanism is not abnormal, and can not get timely self-care and adjustment, will lead to complete destruction of the working mechanism, hit down the service life of tower crane. 5. Tower cranes should be reviewed, protected and maintained from time to time, transmission parts should be provided with sufficient smooth oil, and vulnerable parts should be inspected, repaired or replaced in a timely manner The mechanism bolt is often shocked such as the tower body, attachment and other connecting bolts should always check, if there is a loose must be tightened or changed in time. 6. After a service cycle, the structure, mechanism and other parts of the tower crane will emerge different levels of corrosion, wear and even cracks and other potential safety hazards, so strictly implement the transition maintenance system of the tower crane A comprehensive inspection, adjustment, repair and other maintenance work is very necessary to ensure the tower crane in the next cycle of the necessary prerequisite for safe use.



L48A1 Mast Section

L48A1 mast section is the best in this field

L48A1 Mast Section

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy