L48A1 Mast Section Three Good", "Four Meetings" and "Five Discipline" of Tower Suspension Operation

11-11-2019

In the course of operation, the tower crane operator must strictly follow the equipment safety operation rules, and manage the equipment that belongs to his own operation, and carefully maintain the tower crane used by him, so that the tower crane is often in a neat, clean, lubricated, and safe state. We will earnestly implement the "three good", "four meetings" and "five disciplines."


L48A1 Mast Section  L48A1mast section is the best in this fieldL48A1 Mast Section

1, "three good" that is, good management, good use, good health
Good management: the tower is responsible for the maintenance of the tower, not to allow others to move their own equipment, the equipment's safety protection device, spare parts should be maintained intact.
Good use: Strict implementation of operating procedures, rational use of equipment, stick to the job.
Maintenance: Strict implementation of the succession system, inspection, lubrication, trial operation before the class, cleaning and wiping after the class, serious regular maintenance, active participation in minor repairs, continuous improvement of the ability to repair equipment, on the basis of finding out the condition of the equipment. Gradually master the equipment's natural accident site and emergency measures.
2, "four meetings" will be used, will maintain, will check, will troubleshoot
Will use: in the rental, concentrate on the operation of the procedures, in practice constantly grope and accumulate experience, fully develop the potential of equipment, and prevent personal and equipment accidents.
Will maintain: Be careful to do regular maintenance and routine maintenance, according to the lubrication requirements of each part, to achieve fixed quality, quantity, timing, fixed point refueling lubrication.
It will inspect: perform pre-shift inspection and trial operation carefully, ensure the safety and reliability of various safety devices, braking devices, controllers, etc., and report problems in a timely manner. During the operation, the operation of the equipment is carefully observed and judged from the sound. If there is an anomaly, it should be stopped for inspection and the maintenance personnel should find out the reason.
Will troubleshoot: the tower crane general mechanical and electrical fault should be self-removal, the larger failure contract maintenance personnel jointly. In case of personnel and equipment accidents, keep the scene and report immediately to the leader.