L48A1 Mast Section How to remove the tower crane? Preparation and operation process before demolition

11-12-2019

1. Make preparations before removing the tower crane


L48A1 Mast Section:

http://www.towercranesupply.com/product/l48a1-mast-section-for-tower-crane-mastsL48A1 Mast Section




Check the reliability of the ground anchor, check the fastening of the structural bolts of each part of the tower crane, drive the tower crane to the specified position from the main ground anchor, fasten the rail clamp to wedge the traveling wheel and use the cross brace to strengthen the support between the gantry and the track, check whether there are scaffolds and various line obstacles within the rotating range of the tower body, first remove the crane arm, the arm and other parts of the counterweight bucket Do not throw the iron from high altitude. Use the lifting rope to transport it down.




2. Tower body



L48A1 Mast Section:

http://www.towercranesupply.com/product/l48a1-mast-section-for-tower-crane-masts



Before the same work as the installation of the tower body, a unified command and division of labor shall be carried out to monitor the ground anchor. The detailed inspection of all works shall be carried out to ensure that the machine will not be stopped in the middle of the position. Before placing the tower, a long steel wire rope shall be tied from the top of the tower to pull the inclined tower body with a crane or reaming mill until the tower body exceeds the center of gravity, then the winch can be started to slowly lower the tower body. When approaching to the ground, the speed shall be slowed down to minimize the vibration when the tower body is placed on the pile.


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy